My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-27_REVISION - M1988018
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988018
>
2017-03-27_REVISION - M1988018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:14 PM
Creation date
3/28/2017 8:33:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988018
IBM Index Class Name
Revision
Doc Date
3/27/2017
Doc Name
Request for Technical Revision
From
Midway Aggregates, R.L.L.P.
To
DRMS
Type & Sequence
TR2
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T.17 S.,R.65W. <br /> 1615 RECLAMATION PLAN <br /> 21 2 NOTES <br /> ss A)Reclaimed side slopes(horizontal:vertical)will be <br /> Pit Boundary restored to 3:1 or greater. <br /> Fence `ray B)Reclaimed slopes will be constructed by balancing the <br /> ° cut and fill for each slope. o <br /> 536o C)The average thickness of replaced overburden varies <br /> from o to 6 inches for all phases of reclamation. <br /> D)The average thickness of replaced topsoil for all <br /> i Slo a phases of reclamation varies o to 6 inches. <br /> E)All final elevations will depend on the depth of <br /> material removed. <br /> Top of Bank F)All mining will be above existing ground water. " <br /> G)Reclamation phases will follow mining phases and <br /> Toe of Slope will occur concurrently with mining. <br /> H)Planned weed control activities include tillage and M <br /> mowing as needed to control weeds. <br /> I)Mulch cover will consist of 4,000 lbs./acre of straw <br /> mulch spread and crimped. <br /> Pit Boundary Fence - %Slo - - J)Seed rates and species per NRCS seed mix in the <br /> to. <br /> 3 Slope attached reclamation plan. Seed will be planted with a <br /> seed drill when possible and seed will be broadcast at a <br /> rate 1.5 times the recommended rate in areas that cannot d <br /> be safely accessed by the drill. All traffic will be diverted p <br /> away from seeded areas. h` Z <br /> � O <br /> a <br /> 01iS I; W <br /> 0 a W <br /> O ; a <br /> f w <br /> F <br /> P� <br /> x <br /> N <br /> 4 <br /> SCALE CA � <br /> i in.=500 ft. 4 O <br /> o CZ � <br /> i <br /> a-+ <br /> -• 'd <br /> � z <br /> 534o CU <br /> a <br /> �w <br /> o w <br /> N <br /> O <br /> w <br /> A 02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.