Laserfiche WebLink
---------- <br /> --- PROPERTY OWNERS <br /> _ -----.----- _ LEGEND <br /> t6 t5 — (i)Midway Development Co. <br /> �l �2 <br /> `T.17 S.,R 65 W,6TH PM, (2)Corvette Partners,LLP <br /> El Paso County Colorado _- �' TO COLORADO SPRINGS ' (3)Kirkland Property Holdings,LLC <br /> ( t (4)Sundance Investments o <br /> ' 2) o .I ti (5)Rancho Colorado,LLC 14 <br /> (6)El Dorado Village Metro District w <br /> Pit Boundary <br /> 5360 (7)Kirkland Property Holdings,LLC <br /> 'y (8)Midway Development Co.,Inc. <br /> (9)Midway Development Co.,Inc. <br /> o <br /> iE R (lo)Midway Development Co.,Inc. <br /> Pit Boundary <br /> MINE PLAN 20I <br /> 4 <br /> w <br /> �/ PHASE 4 - t •� all NOTES <br /> ±22 acres A)This is an active mining operation. <br /> B)Mining activities are dependent on market <br /> PHASE 3 \�M ING \ccl��,,,�,• .;,,��r L.hic � <br /> ry !. <br /> (1) I. r demands for asphalt and aggregate products in , <br /> ±22 acres Di1�ECTION '�. the local area. C <br /> (3)-Kirkland Property Holdings,LLC PIIASF.5 �� p p <br /> Visual buffer below contour C)All topsoil will be removed and stockpiled <br /> Midway Gravel Pit,Permit No.M198`o18 ±22 acres �G' elevation t <br /> , . 5,34o ft.along east for later reclamation use m each phase. <br /> _ side of pit.NO DISTURBANCE D)Topography is from USGS quadrangles. <br /> o_ t26 ACRES Final reclamation elevations will depend on w U' <br /> ` Z <br /> actual gravel depth. <br /> Xcel Energy AFFECTED MINE AREA = _ '• E)Stockpiles and processing equipment will W Z <br /> Power Line PHASE 2 Pit Boundary move during the mines life. <br /> (1 ,� / ±22 <br /> Fence <br /> F)Vehicle parking and truck scales are located a [� <br /> l r at the mine entrance gate. > A W <br /> ±25 ft Mine Buffer, ; ' G)Mining phases will be followed by ; <br /> Min.Disturbance,do acre _ rt (4) J o <br /> / =y reclamation phases which will take place <br /> concurrently with mining operations. f a1 <br /> El Na (9) _ `: : r H)All mining will be above ground water. <br /> mb <br /> ra 1ie I)Mine depth will be ±10 to 20 feet. <br /> r <br /> - � (g) j J)Stormwater BPM's will be used to control <br /> erosion. There will be no offsite erosion or <br /> (1� Pit Boundary Fence SCALE drainage from this facility. <br /> 1 in.=Soo ft. K)There will be a 25 ft mine buffer along the <br /> n <br /> west and north boundaries. There will be a <br /> MINE ACCESS ROAD,SCALE PREVIOUSLY visual buffer along the east side of the pit with <br /> PAD&VEHICLE PARKING ,Reclaimed Are a top elevation at t5,340 ft. This visual buffer <br /> 38033'20"N - io4°39'15"W wi11 not be disturbed during mining operations. <br /> L) Proposed mining will proceed counter <br /> (3) clockwise direction from the existing affected N 0 00 <br /> + \ / '-' mine area towards the Northwest. *� � <br /> M)Mining will be on the gravel cap areas. CZ 00 <br /> �+ ( N)No permanent buildings will be left on site. o� <br /> °o Scales are portable and may be removed when U Q <br /> mining is not active on the site. +, <br /> L� O)Stockpiles may consist of topsoil, a V o <br /> overburden,processed materials and materials c> CZ Z <br /> to be recycled for future products. Stockpiles .d ' <br /> - 1 (7}' 1 (5� may occur anywhere within the permit b <br /> f boundary. <br /> P)An asphalt plant maybe on site and placed in <br /> J'ti t % . . the mining area near material stockpiles. <br /> Rancho Colorado Blvd. t <br /> To PUEBLO Q)Mining Operation-Sand and gravel will <br /> mined with excavator,dozers and loaders. The <br /> _ M material will be processed using crushers and <br /> screens to produce specification material. <br /> + I A 01 <br />