Laserfiche WebLink
REVEGETATION <br /> Revegetation Area (Acres) jAcres 1 22 <br /> Straw I bs/acre 4,000 <br /> Straw I bs 88,000 <br /> Straw tons 44 <br /> Bales 50 Ibs/bale ea 1,760 <br /> Bales fob pit (Hayco) $/bale 1 $4.501 7,920.00 <br /> Straw Total $ 7,920 <br /> No Fertilizer not required) $/acre 1 $0.00 <br /> Seed-Native GrassIs/acre 1 $43.00 $ 946.00 <br /> Seed Total $ 946.00 <br /> $/HR hrs <br /> Tractor(50 hp) & Plow for compacted <br /> areas $34.00 12 $408.00 <br /> Tractor(50 hp) &Straw Blower(Small <br /> Bale) $27.00 8.00 $216.00 <br /> Tractor(50 hp) & Disk Crimper $29.00 8.00 $232.00 <br /> Tractor(50 hp) &Seed Drill $31.00 8.00 $248.00 <br /> Operator $38.00 36.00 $1,368.00 <br /> Laborer(tea) $23.00 16.00 $368.00 <br /> Total Equipment& Labor $2,840.00 <br /> Straw(Hayco) $7,920.00 <br /> Fertilizer $0.00 <br /> Seed Mix(Granite) $946.00 <br /> Tractor&Attachments $1,104.00 <br /> Labor $1,736.00 <br /> Job Cost $11,706.00 <br /> Replacement Cost 30% $3,511.80 <br /> Total Job Cost $15,217.80 <br /> $/acre 691.72 <br /> NOTES <br /> Revise acerage to reflect 22 acre phase. <br />