Laserfiche WebLink
FINISH GRADE SITE <br /> Total Area to be graded Acre 22 <br /> Adjusted Hourly Fleet Production Acre/hr 1.3745 <br /> Total Job Time hr 16.01 <br /> Total Fleet Cost per hr $/hr $105.66 <br /> Total Job Cost $ 1 $1,691.17 <br /> NOTES <br /> Revise acerage to reflect 22 acre phase. <br />