Laserfiche WebLink
Proposed 2017 Operations: <br />Operations will be in conjunction with operations on Glacier Peak Mining claims between mid- <br />May through early August. Mechanized operations will be limited to 10 working days on the <br />Crystaljack claims. We will use a John Deere 350 or equivalent on the Two Point at Site 7 to <br />complete this site for up to .5 acre. Site visits, including mineral extraction, reclamation, and <br />claim maintenance will be continued throughout the season. <br />Proposed 2017 Disturbances: <br />Proposed operations for 2017 at Site 7 on Two Point claim will be for maximum .5 acre. Upon <br />completion, the site will be closed and reseeded unless significant mineral exposure is <br />encountered. <br />Proposed 2017 Reclamation: <br />Upon completion of sites opened during 2017, approximately 0.2 acre will be closed and <br />reseeded. All previously mined sites have good growth and timber is reestablished. <br />Sufficiency of Bond: <br />A reclamation bond of $ 6,231 was renewed and set aside in February 2013 to cover annual <br />operations and disturbances under this mining permit. Additionally, a bond for $11,190 covering <br />roads for this operation and two other operations is set aside with the U.S.F.S. <br />Respectfully submitted, <br />ZOJOSEPH'LL. DORRIS <br />Operator, Crystaljack Mining <br />