My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-23_REPORT - M1993030 (5)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1993030
>
2017-03-23_REPORT - M1993030 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 2:29:30 PM
Creation date
3/27/2017 9:31:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993030
IBM Index Class Name
Report
Doc Date
3/23/2017
Doc Name
Annual Fee/Report/Map
From
Joseph L. Dorris
To
DRMS
Annual Report Year
2017
Email Name
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINED LAND RECLAMATION BOARD 110(1) ANNUAL REPORT <br />For Season 2016 <br />CRYSTALJACK MINING <br />PERMIT NO. M-1993-030 <br />Prepared: 20 March 2017 <br />Summary: <br />No mechanized equipment was operated on Crystaljack mining properties during 2016. Hand <br />digging and prospecting and claim maintenance was carried out between 6 June and 3 Nov 2016. <br />Illegal digging is occurring on the Two Point claim and Qui-Buc No. S adjacent to roads. A total <br />of three claims of the original three claims have been sold. This reclamation permit does not <br />cover any sites that were on those three claims: Free Hawk, C & J No. 1, and C & J No. 2 <br />Inspections <br />On 9 June, both the Division of Reclamation, Mining, and Safety (Tim and Elliot), and the U. S. <br />Forest Service (Anthony and Amy) accompanied me to inspect sites on Crystaljack claims. Sites <br />were considered reclaimed and revegetated, including sites on the Ute, which were the most <br />recent digs. Also inspected sites on Two Point and several of the Qui-Buc claims. <br />Map Depicting Operations: <br />No changes have been made to permitted sites. All sites are reclaimed and revegetated with good <br />growth. <br />Current Disturbances (2016): <br />All dig sites on Crystaljack properties have been reclaimed except for access roads and proposed <br />dig sites. <br />Reclamation Summary (Includes 2016 Reclamation): <br />Since this project began in 1993, approximately 4.89 acres have been excavated and reclaimed. <br />All newly reclaimed sites have been reseeded the same season. These sites are then planted with <br />trees the following season. Site 4 on the Ute has 80 percent growth. All other sites exceed 80 <br />percent or better. <br />Reclamation Completed During 2016: <br />Nothing additional was reclaimed in 2016. <br />
The URL can be used to link to this page
Your browser does not support the video tag.