My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-23_HYDROLOGY - M1980149
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1980149
>
2017-03-23_HYDROLOGY - M1980149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 2:02:03 PM
Creation date
3/24/2017 1:45:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980149
IBM Index Class Name
Hydrology
Doc Date
3/23/2017
Doc Name
Substitute Water Supply Plan
From
DNR Water Resources
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hokestra SWSP Page 2 of 11 <br />March 20, 2017 <br /> <br />been posted for this work because a financial warranty is not required for a county. The County will <br />pursue an augmentation plan for the remaining unlined areas using their 3.5 Rural Ditch shares. <br />The Hokestra Pit is located in the N1/2 of Section 2, Township 2 North, Range 68 West and <br />the S1/2 of Section 35, Township 2 North, Range 68 West, 6th P.M., Weld County. The site consists <br />of 12 cells. <br />Depletions <br /> A summary of each cell is provided in the Table 1, below: <br /> <br />Table 1: Ground water exposure by cell <br /> <br />The County has completed mining in all cells with the exception of Cells 3 through 6 located <br />in the center of the gravel pit site (Figure 1). Cell 3 and 4 are currently being mined and Cells 5 <br />Cell <br />Exposed <br />Post-80 <br />Acres <br />Exposed <br />Pre-81 <br />Acres <br />Consumptive <br />use <br />(ac-ft) <br />Comments <br />1 8.4 - 31.0 <br />Includes losses from 9.6 acre-feet of <br />irrigation use. Cell reclaimed as ground <br />water lake. <br />2 - - - Slurry wall construction complete; liner test <br />approved October 7, 2014 (WDID 0503324) <br />3 - - - <br />South Slurry Wall-Slurry wall construction <br />complete; liner test approved October 7, <br />2014-will be mined in the future (WDID <br />0503325) <br />4 - - - <br />North Slurry Wall-Slurry wall construction <br />complete; liner test approved October 7, <br />2014-currently being mined (WDID 0503326) <br />5 - - - <br />South Slurry Wall-Slurry wall construction <br />complete; liner test approved October 7, <br />2014 (WDID 0503325) <br />6 - - - <br />South Slurry Wall-Slurry wall construction <br />complete; liner test approved October 7, <br />2014 (WDID 0503325) <br />7 0.1 9.9 0.3 Cell reclaimed as ground water lake. <br />8 4.3 - 11.0 Cell reclaimed as ground water lake. <br />9 2.1 - 5.4 Cell reclaimed as ground water lake. <br />10 5.5 - 14.0 Cell reclaimed as ground water lake. <br />11 2.2 1.7 5.6 Cell reclaimed as ground water lake. <br />12 10 2.5 25.5 Cell reclaimed as ground water lake. <br />Totals 32.6 14.1 83.2 Totals do not include potential dewatering.
The URL can be used to link to this page
Your browser does not support the video tag.