Laserfiche WebLink
July 6. 2016 Miller Geotechnical Consultants,Inc. <br /> 1027 W.Horsetooth Rd,Suite 200 <br /> Fort Collins, CO 80526 <br /> (970)682-2555(office) <br /> (970)581-8988(mobile) <br /> Deb.Miller@millergeotech.com <br /> Battle Mountain Resources. Inc. <br /> PO Box 310 <br /> San Luis. CO 81152-0310 <br /> Attn: Mr. Julio Madrid. Site Manager <br /> Re: 2016 Dam Safety inspection Report for San Luis Tailings Dam <br /> Dear Mr. Madrid: <br /> Attached is the 2016 Annual Inspection Report for San Luis Tailings Dam. phis is the third annual dam <br /> safety inspection conducted by Miller (icotechnical Consultants (MGC) for the facility following the <br /> initial (2013) detailed inspections and dam safety analysts ofthe facility performed by MGC' which are <br /> documented in the initial Detailed Inspection Report(MG(' 2014'). <br /> The subsequent first annual inspection%%as performed in April 2014. Tvvo maintenance issues were noted <br /> in the April 2014 annual inspection: (1) minor surface erosion was observed in an area repaired in 2013 <br /> can the downstream right groin ofthe dam embankment. and (2) re-blocking ol'the sub-drain pipe outfalls <br /> at the toe ofthe dam due to sloughing of earth materials above tite pipes. T`he pipe out falls were cleared <br /> of debris in 2013 but new sloughing had partially re-covered the pipes in the spring of 2014. After the <br /> .April 2014 annual inspection. the right groin area vvas repaired again by re-grading and construction of <br /> contour herms and ditches on the dam face directing runoff into the right groin ditch. <br /> Fhe second annual inspection was completed in January 2015. At that time, the right groin area repair <br /> appeared to be in good condition, but minor erosion rills were observed. Additional erosion protection <br /> was recommended to prevent gullying and erosion in this area. In 2015 the erosion-control measures were <br /> enhanced by adding riprap-fined down-drain channels. and seeding »ith vegetation (see Photos 16-21. <br /> attached). The system appears to he �%orkinl_' quite well, except for some erosion where flow from the <br /> rock-lined down-drains is jumping over the contour berms at the bottom of the rock channels(see Photos <br /> 19 and 20). This situation should continue to be monitored and may be improved by minor grading efforts <br /> and shaping ofthe dcnvn-drain channel:to reduce flow velocities into the cross berms. Vegetation appears <br /> to be getting established .utd the erosional stability in this area is anticipated to improve over time as <br /> vegetation matures. <br /> titGC (2014) San t.ws Project Iailing Dam Detailed inspection Report. prepared for Battle Afountain Resources Inc. be <br /> Miller Geotechnical Consultants.Fort Collins.CO,Februan. <br /> X <br /> 2016 Dam Safety Inspection Report San Luis Tailings Dam <br />