Laserfiche WebLink
55' <br />.8 <br />Over Head Power Line <br />(Closest Structure that could be affected) <br />20' <br />18' <br />3H:1V Backfilled Reclamation slope <br />1.5H:1V <br />dining Slope <br />RECEIVED <br />MAR 21 2017 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />51'"all mf,5 <br />2.7H:1 V <br />Slope Failure Line if <br />failure occurs To <br />The Power Line <br />Nora PAM" W DATq Mm 3I DAlE - <br />°r'""0 Greg Lewfcki Arai Associates Figure 4 so2_c(a)1 <br />CW Slopo Stability <br />a.• o...�•�.ra. �+.... BW Pit <br />t N <br />rD <br />I� <br />13 <br />3 <br />frD <br />13 <br />I <br />i � <br />