Laserfiche WebLink
Weight description: User Provided <br />Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Material consistency: <br />1.100 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />1.000 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.862 <br />Blade type: <br />1.000 <br />Net correction: 0.5903 <br />Adjusted unit 558.42 LCY/hr <br />production: <br />Adjusted fleet 2233.68 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.493/LCY <br />Total job time: 89.54 Hours <br />Total job cost: $98,601 <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />(AVG.) <br />SHIFT/DA <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />Page 51 of 340 <br />CIRCES Cost Estimating Software <br />