Laserfiche WebLink
Page 50 of 340 <br />BULLDOZER WORK <br />Task description: Spread Uncompacted Refuse on Gob Pile #2 <br />Site: Bowie No. 2 Mine Permit Action: RN4 Permit/Job#: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 036 <br />Date: 3/1/2017 <br />7:38:34 AM <br />State: Colorado <br />County: Delta <br />User: JDM <br />Agency or organization name: <br />DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D10T - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Abbreviation: None <br />Filename: C083-036 <br />$122.17 <br />Utilization % <br />NA <br />$111.29 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $275.31 <br />Total Fleet Cost/Hour: $1,101.22 <br />MATERIAL QUANTITIES <br />Initial Volume: 200,000 <br />Swell factor: 1.000 <br />Loose volume: 200,000 LCY <br />Source of estimated volume: TR -44 Submittal Page 4 <br />Source of estimated swell Cat Handbook <br />factor: <br />1010 t1l a'd 9:Z111110 M (I],I <br />Average push distance: 200 feet <br />Unadjusted hourly 946.0 LCY/hr <br />production: <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push 0% <br />gradient: <br />Average site altitude: 6,100 feet <br />Material weight: 2,667 lbs/LCY <br />CIRCES Cost Estimating Software <br />