My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-13_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2017-03-13_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2017 7:54:05 AM
Creation date
3/14/2017 11:21:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/13/2017
Doc Name
Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
RN4
Email Name
CCW
JRS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 340 <br />044 <br />045 <br />046 <br />050 <br />051 <br />052 <br />053 <br />060 <br />061 <br />062 <br />063 <br />064 <br />065 <br />066 <br />070 <br />071 <br />072 <br />073 <br />074 <br />075 <br />076 <br />077 <br />078 <br />079 <br />080 <br />081 <br />083 <br />084 <br />085 <br />086 <br />090 <br />091 <br />092 <br />093 <br />095 <br />096 <br />097 <br />098 <br />099 <br />100 <br />101 <br />102 <br />106ag <br />106ah <br />Place Coverfill from Stockpiles on Gob Pile #2 SCRAPER1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />1 <br />4 <br />1 <br />4 <br />1 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />173.74 <br />$86,608.00 <br />$77,388.00 <br />$97,980.00 <br />$104,281.00 <br />$11,440.00 <br />$38,992.00 <br />$23,244.00 <br />$369.00 <br />$4,427.00 <br />$2,459.00 <br />$70,429.00 <br />$9,168.00 <br />$4,427.00 <br />$128.00 <br />$139,801.00 <br />$15,224.00 <br />$2,576.00 <br />$6,354.00 <br />$3,542.00 <br />$97,914.00 <br />$28,752.00 <br />$2,832.00 <br />$6,156.00 <br />$884.00 <br />$2,422.00 <br />$1,976.00 <br />$522.00 <br />$1,138.00 <br />$43,449.00 <br />$72,657.00 <br />$17,450.00 <br />$2,272.00 <br />$929.00 <br />$6,802.00 <br />$2,272.00 <br />$3,364.00 <br />$2,371.00 <br />$3,149.00 <br />$7,140.00 <br />$442.00 <br />$315.00 <br />$13,199.00 <br />$1,440.75 <br />$1,435.89 <br />Haul Cover Material from Gob Pile #3 to Gob Pile TRUCKI <br />#2 <br />235.64 <br />Place 2.5' of Coverfill on Gob Pile #3, from SCRAPER1 <br />stockpile <br />196.56 <br />Compact Backfilled D -Portal Bench,Roads, & COMPACT <br />Utility Corridor <br />511.43 <br />Compact Backfilled Material at Truck COMPACT <br />Loadout/Coal Stockpile <br />56.10 <br />Compact Backfilled Train Loadout COMPACT <br />191.23 <br />Compact B -Seam Portal Bench COMPACT <br />113.99 <br />Rip Utility Bench RIPPER <br />0.30 <br />Rip D -Portal Bench RIPPER <br />3.71 <br />Rip Truck Loadout/Coal Stockpile Area RIPPER <br />2.06 <br />Rip Regraded Mine Area Prior to Topsoil RIPPER <br />Replacement <br />59.09 <br />Rip Train Loadout Facilities and Railbed Benches RIPPER <br />7.69 <br />Rip B -Seam Portal Bench RIPPER <br />3.71 <br />Rip Rock La down Pad Topsoil RIPPER <br />0.43 <br />Rip Haul Roads (Portion Being Reclaimed) & Old RIPPER <br />Truck Loadout <br />116.47 <br />Remove Haul Road Subbase and Place on Gob Pile SCRAPER1 <br />#1 <br />30.54 <br />Rip Truck Loadout Road RIPPER <br />2.14 <br />Haul Truck Loadout Subbase to Gob Pile #1 SCRAPER1 <br />12.75 <br />Rip Upper Haul Road Asphalt Prior to Road RIPPER <br />Narrowing <br />2.95 <br />Pull Back/Haul Fill Mat'l from Upper Haul Rd TRUCKI <br />Narrowing <br />141.47 <br />Regrade Narrowed Section of Haul Road DOZER <br />26.11 <br />Rip Gob Pile #1 Road RIPPER <br />2.35 <br />Regrade Gob Pile 41 Road DOZER <br />5.17 <br />Rip Access Road RIPPER <br />0.73 <br />Haul Access Road Surface to Gob Pile #1 SCRAPER1 <br />4.86 <br />Regrade Access Road DOZER <br />1.79 <br />Backfill and Regrade Haul Road to Gob Pile #2 DOZER <br />0.44 <br />Rip Lower Haul Road RIPPER <br />0.95 <br />Regrade Lower Haul Road DOZER <br />36.46 <br />Regrade Light Use Roads from MRs and TRs DOZER <br />60.96 <br />Finish Grade Disturbed Mine Area GRADER <br />129.92 <br />Finish Grade Train Loadout GRADER <br />16.91 <br />Finish Grade B -Seam Portal Bench GRADER <br />6.91 <br />Finish Grade Gob Piles #1, #2, #3, and #4 GRADER <br />50.64 <br />Backfill and Regrade Pond B DOZER <br />7.63 <br />Backfill and Regrade Pond C DOZER <br />11.61 <br />Backfill and Regrade Gob Pile Pond D DOZER <br />8.18 <br />Backfill and Regrade Pond F DOZER <br />10.87 <br />Backfill and Regrade Pond J DOZER <br />24.64 <br />Backfill and Regrade Pond K DOZER <br />1.52 <br />Excavate for Post -mining Channel at B -Seam EXCAVATE <br />Portals <br />0.63 <br />Install Riprap, Gravel, and Geotextile in B -Seam POSTMININ <br />Channel G <br />65.53 <br />Plug and seal AW -15 BOREHOLE <br />6.00 <br />Plug and seal AW 16 BOREHOLE <br />6.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.