Laserfiche WebLink
Task description: <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />of Bowie No. 2 Mine Reclamation Tasks <br />Permit Action: RN4 <br />Task #: 000 State: Colorado <br />Date: 3/1/2017 County: Delta <br />1:46:44 PM <br />User: JDM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1996083 <br />Abbreviation: None <br />Filename: C083-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />005 <br />006 <br />007 <br />008 <br />009 <br />010 <br />011 <br />012 <br />013 <br />014 <br />015 <br />019 <br />020 <br />021 <br />022 <br />023 <br />025 <br />027 <br />036 <br />037 <br />038 <br />039 <br />040 <br />041 <br />042 <br />043 <br />Pull back and Haul Portal Bench Fill Material to <br />Cut Slope <br />TRUCKI <br />1 <br />4 <br />4 <br />2 <br />4 <br />2 <br />4 <br />2 <br />4 <br />4 <br />1 <br />1 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />1 <br />1 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />609.56 <br />$421,882.00 <br />$174,031.00 <br />$1,906.00 <br />$10,632.00 <br />$9,040.00 <br />$73,761.00 <br />$35,659.00 <br />$215,797.00 <br />$188,924.00 <br />$6,183.00 <br />$30,224.00 <br />$57,888.00 <br />$46,127.00 <br />$8,822.00 <br />$528.00 <br />$40,737.00 <br />$753.00 <br />$21,081.00 <br />$914.00 <br />$3,448.00 <br />$98,601.00 <br />$110,927.00 <br />$2,417.00 <br />$27,720.00 <br />$261,010.00 <br />$30,145.00 <br />$1,089.00 <br />$7,878.00 <br />Regrade D -Portal Bench <br />DOZER <br />158.03 <br />Rip and Regrade Material Storage Area at Gob Pile <br />DOZER <br />1.73 <br />Pull Back Material @ Old Truck Loadout Material <br />Storage Area <br />EXCAVATE <br />21.27 <br />Regrade Old Truck Loadout Material Storage Area <br />DOZER <br />8.21 <br />Pull Back Material at Truck Loadout/Coal <br />Stockpile <br />EXCAVATE <br />147.57 <br />Regrade New Truck Loadout and Coal Stockpile <br />DOZER <br />32.38 <br />Pull Material Back onto Train L/O Facil. and <br />Railbed Benches <br />EXCAVATE <br />431.74 <br />Regrade Train Loadout Facilities and Railbed <br />Benches <br />DOZER <br />171.56 <br />Backfill and Regrade Train L/O Overland <br />Conveyor Corridor <br />DOZER <br />5.62 <br />Haul Fill from Upper Mat'l Strge Area to B -Seam <br />Portal Bench <br />SCRAPER1 <br />60.63 <br />Haul Fill fr Adj. Mat'l Storage Area to B -Seam <br />Portal Bench <br />TRUCKI <br />89.33 <br />Backfill and Regrade B -Seam Portal Bench <br />DOZER <br />38.70 <br />Regrade Drill Pads from MRs and TRs <br />DOZER <br />8.01 <br />Regrade Material Storage Area from TR -29 <br />DOZER <br />0.48 <br />Backfill and Regrade New Prep Plant Bench <br />DOZER <br />36.99 <br />Replace Fill from Material Storage Area to Water <br />Tank Bench <br />SCRAPERI <br />1.51 <br />Regrade Borrow Area <br />DOZER <br />19.14 <br />Regrade Upper Parking Lot Expansion Area <br />EXCAVATE <br />3.65 <br />Haul Rock to Vent Shafts for Disposal <br />TRUCKI <br />10.50 <br />Spread Uncompacted Refuse on Gob Pile #2 <br />DOZER <br />89.54 <br />Spread Uncompacted Refuse at Gob Pile #3 <br />DOZER <br />100.73 <br />Compact Material Hauled to Gob Pile #1 <br />COMPACT <br />11.85 <br />Compact Refuse on Gob Pile #2 <br />COMPACT <br />135.94 <br />Haul refuse out of Gob Pile #243 drying areas for <br />placement <br />TRUCKI <br />909.13 <br />Compact Refuse at Gob Pile #3 <br />COMPACT <br />147.84 <br />Haul Topsoil from Stockpile Area to Gob Pile #1 <br />SCRAPERI <br />2.18 <br />Place 3.5' of Coverfill on Gob Pile #1 <br />SCRAPERI <br />15.80 <br />