Laserfiche WebLink
TR-89 Reclamation cost estimate <br /> Reclamation Task Description I Dimensions Units Cost per unit I Total Cost <br /> Concentrate stock ile facility <br /> Demolish concrete for concentrate storage building 967 CY $32.13 $31,069.71 <br /> including; slab,concrete walls,and truck load out <br /> Demolish concentrate load out conveyor 200 ft $21.80 $4,360.00 <br /> Demolish rigid steel frame building walls and roof 12700 sqft $1.68 $21,336.00 <br /> Truck Scale <br /> Demolish reinforced concrete foundation 6" 1200 sgft $0.99 $1,188.00 <br /> Demolish truck scale 840 sgft $11.82 $9,928.80 <br /> Demolition of underground electricity and fiber optics 325 LF $1.13 $367.25 <br /> Sub total $68,249.76 <br /> DRMS total <br /> costs% 18.5 <br /> Total cost $80,875.97 <br /> Implementation Schedule <br /> After approval of this TR, CC&V will begin construction on the essential facilities and infrastructure. <br /> CC&V anticipates completing construction by mid-summer 2017. While the construction is taking place <br /> the trucking contract will be put out to bid. CC&V anticipates the first shipment of concentrate will leave <br /> site October 2017. <br /> Enclosed please find check no. 200027330 in the amount of$1,006 for the technical revision fee. Should <br /> you require further information please do not hesitate to contact Tyler O'Donnell at 719.689.4056 or <br /> myself 719.689.4055 or Meg.Burt(a)newmont.com. <br /> Sincerely, <br /> Meg Burt <br /> Senior Environmental Manager <br /> Cripple Creek&Victor Gold Mining Co <br /> MB/tvo <br /> Attachments 1 -4 <br /> Ec: T. Cazier—DRMS <br />