My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-10_REVISION - C1981019 (9)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2017-03-10_REVISION - C1981019 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 7:45:12 AM
Creation date
3/13/2017 7:01:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/10/2017
Doc Name
Application
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
SL12
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 SUCCESS COMPARISON <br />The demonstration of adequacy and a minimum of 20 transects in each unit (Table SA) allow for a <br />direct comparison for perennial cover per Rule 4.15.11 (2)(a). Chart 3 displays the results from ground <br />cover sampling, and reveals that the Phase II Bond Release Block exceeds the reference area comparison <br />with 44.45% perennial cover versus the 40.77% perennial cover standard (90% of 45.29%). <br />Chart 4 displays the results from sedimentology analysis, and reveals that the Phase II Bond Release <br />Block post -mining evaluation exhibits less predicted erosion than the pre -mining evaluation with 0.152 <br />tons/acre/year versus 0.172 tons/acre/year. <br />Chart 4 <br />Averayad Sedimentology Success Criterion Comparison - 2014 <br />0.300 <br />Successful When <br />d Post -Mining Below <br />a <br />Pre -Mining Values <br />a 0.200 --- —. __---__ <br />c <br />0 <br />0.100 <br />9 <br />a` <br />0.000 <br />Pre -Mining Post -Mining <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.