My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-10_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2017-03-10_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 7:22:00 AM
Creation date
3/13/2017 6:51:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
3/10/2017
Doc Name
Application
From
Snowcap Coal Company
To
DRMS
Type & Sequence
SL10
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Janet Binns -3- March 7, 2017 <br />Application No. 2 (SL -02) and on November 14, 2015, with the approval of Bond Release <br />Application No. 8 (SL -08). Phase II bond release on these acres was approved on <br />January 3, 2017 with SL -9. These acres were seeded with approved seed mixes and <br />monitored/sampled as per SCC's permit requirements. Dates and seed mixes for each <br />individual area can be found in Tab 6 of this application in the 2016 Annual Reclamation <br />Report. <br />G Substation (0.6 acres); CRDA1 Road (1.2 acres), CRDA1 Top (1.0 acres) and Pond 11 <br />(1.2 acres) — Cedar Creek Associates, Inc. (CCA) was contracted in 2016 to evaluate <br />these acres for bond release. Sampling was conducted in June 2016 in the interest of <br />ascertaining establishment of vegetation to support the approved postmining land use <br />and to meet the approved success standard for cover in accordance with Rule <br />4.15.10(2). CCA's Introduction, Results and Vegetation Sample Area Location Maps <br />from the "2016 Revegetation Evaluation Report" are included in this submission in Tab 7. <br />The G Substation, Pond 11 and CRDA1 Top and Road have been approved as <br />"Commercial/Industrial" for its postmining land use. Snowcap's permit states on page 15- <br />2 that the approved postmining land use will be considered to have substantially <br />commenced and likely to be achieved after work is commenced on the Sports Complex <br />on any portion of the 4.0 acres of bonded land. The new access road and other dirt work <br />have been initiated by CPW and Town of Palisade for the Cameo Sports Complex <br />crossing the G Substation acreage. <br />17. Copies of the written notice to seek release to parties identified in Rule 3.03.2(1): <br />A Certificate of Service, which documents the notices required under Rule 3.03.2(1) have <br />been mailed, can be found in Tab 3. <br />18. Copy of newspaper advertisement: <br />Proof of publication of the public notice of the bond release should be available in about <br />three to four weeks. <br />Please call if you have any questions. <br />Sincerely, <br />Tonya K. Hammond <br />Owner's Representative <br />Enclosures <br />cc: Mesa County Clerk, BLM, Office of Surface Mining, SCC File <br />
The URL can be used to link to this page
Your browser does not support the video tag.