My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-10_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2017-03-10_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 7:22:00 AM
Creation date
3/13/2017 6:51:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
3/10/2017
Doc Name
Application
From
Snowcap Coal Company
To
DRMS
Type & Sequence
SL10
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Janet Binns -2- March 7, 2017 <br />13. Legal Description of Area Requested: <br />T10S, R98W, 6" P.M. <br />Section 27: Portions of S%SW%4 <br />Section 28: Portions of SE% <br />14. A Map Showing Area: SL -10 Bond Release Exhibit and; <br />Colorado Parks and Wildlife (CPW) "Draft Conceptual Plans - Cameo Shooting and <br />Education Complex - East Site". <br />15. Dates Reclamation Work Performed: <br />Sediment Pond 11 -1.2 acres for Phase III - #20 on SCC ARR. <br />In October 2012 approximately 1.2 acres at Pond 11 were backfilled, graded, top -soiled <br />and seeded. The area was covered with mud during a flash flood in July 2015 causing <br />the area to be re -seeded and mulched in November 2015. Phase I bond release on the <br />1.2 acres was approved on November 14, 2015 with SL -8. Phase II bond release on the <br />1.2 acres was approved on January 3, 2017 with SL -9. Postmining land use change of <br />the 1.2 acres from Fish and Wildlife to Commercial/Industrial was approved on January 3, <br />2017 with PR -6. <br />G Substation - 0.6 acres for Phase III release - #22 on SCC ARR. <br />In September 2008 all structures were removed at the G Substation. Approximately 0.5 <br />acres were backfilled and graded to approximate original contours, top -soiled and seeded <br />and approximately 0.1 acres were re -disturbed and re -seeded during reclamation of <br />drainage features. Phase I bond release on 0.1 acres were approved on October 27, <br />2003 with SL -2 and on 0.5 acres on November 14, 2015 with SL -8. Phase II bond <br />release on the 0.6 acres was approved on January 3, 2017 with SL -9. Postmining land <br />use change of the 0.6 acres from Fish and Wildlife to Commercial/Industrial was <br />approved on January 3, 2017 with PR -6. <br />Cameo Refuse Disposal Area 1 Road (CRDA1 Road) -1.2 acres for Phase III <br />release - #32 on SCC ARR. <br />In September 2010 approximately 1.2 acres of the CRDA1 "access" road were backfilled, <br />graded, top -soiled and seeded. Phase I bond release on the 1.2 acres was approved on <br />November 14, 2015 with SL -8. Phase II bond release on the 1.2 acres was approved on <br />January 3, 2017 with SL -9. Postmining land use change of the 1.2 acres from Fish and <br />Wildlife to Commercial/Industrial was approved on January 3, 2017 with PR -6. <br />Cameo Refuse Disposal Area 1 Redisturbed Area (CRDA1 Top) -1.0 acres for <br />Phase III release - #18 on SCC ARR. <br />In September 2010 approximately 1.0 acres of the CRDA1 Top was graded and re- <br />seeded. This area had been redisturbed in December 2009 when it had been used as a <br />lay down area for coal refuse from McClane Canyon Mine and remaining SCC coal fines <br />clean up. Topsoil, salvaged prior to redisturbance, was distributed over area prior to <br />seeding. Phase I bond release on the 1.0 acres was approved on October 27, 2003 with <br />SL -2. Phase II bond release on the 1.0 acres was approved on January 3, 2017 with SL - <br />9. Postmining land use change of the 1.0 acres from Fish and Wildlife to <br />Commercial/Industrial was approved on January 3, 2017 with PR -6. <br />16. A description of results achieved: <br />Acres submitted for Phase III release (4.0 acres) <br />The acres requested for Phase III Bond release in this submittal successfully achieved <br />Phase I Bond release on October 27, 2003, with the approval of Bond Release <br />
The URL can be used to link to this page
Your browser does not support the video tag.