Laserfiche WebLink
to have 12-I8 inches (36,945 CY) of material, therefore it is anticipated that there will be <br />sufficient material available onsite to topsoil all of the disturbance created by mining. <br />Once topsoil is placed, it will be disked or harrowed prior to seeding. <br />3. Haul Roads and Access <br />All haul routes are contained in the mining phases, and will be reclaimed with them. The site <br />access will remain in place following mining. <br />4. Reclamation Timetable <br />Reclamation of the Fairplay Au Pit will take place on the estimated timeline shown in Table E-2 <br />below. <br />Table E-2 Reclamation Timetable <br />Activity Time to Complete <br />Mining of Phase 1 ; 2 years <br />Mining of Phase 2; Reclamation of Phase 1 1.5 years <br />MinLv jq Phase 3; Reclamation of, Phase 2 _ j_ 1 year _ <br />Reclamation of Phase 3 0.5 years <br />Total l 5 yea rs <br />5. Revegetation Plan <br />Following the placement of topsoil, seeding of native species will take place in the next <br />appropriate planting season. This will either be in the spring (March I5-ApriI 15) or in the fall <br />(September 15 -November 15). The topsoil will be disked or harrowed in advance of seed <br />application. Topsoil stockpiles that are in place longer than 90 days will also be seeded with this <br />mix. <br />Table E-3 shows the seed mix and seeding rates that will be applied at the Fairplay Au Pit. <br />Fairplay Ait Pit March 201.7 E-2 c,gUWkM WAnoc„mfay <br />