Laserfiche WebLink
South Platte Combined Replacement Plan Page 2 of 19 <br />March 1, 2017 <br />The Tucson Pit (M-1991-140, WDID 0203033) was previously included in this SWSP. Mining <br />operations at the Tucson Pit have been completed, and a request for a full performance and <br />financial warranty release for the Tucson Pit was approved by the DRMS on April 29, 2016. A portion <br />of the pit (Rogers Reservoir, WDID 0203917) has been lined with a slurry wall and has obtained SEO <br />liner approval. All post -pumping depletions have been replaced under previous SWSPs. The <br />remaining 2.0 -acre pond is located within the boundaries of the Tucson South Pit and will be <br />accounted for and reclaimed under that permit. <br />The general location of the mining sites are identified in Table B below and depicted on the <br />attached f=igure 1. The required fee of $2,570 (10 sites X $257/site renewal fee) has been received <br />(receipt no. 3677685). <br />Table B - Pit Locations <br />Site Name <br />Location <br />Jeronimus Pit <br />Section 16, T2S, R67W <br />Hazeltine Pit <br />Section 9, T2S, R67W <br />Brighton Pit <br />Sections 14 and 23, TIS, R67W <br />Tucson South Pit <br />Sections 1 and 12, T15, R67W <br />Wattenberg Pit <br />Sections 25 and 36, T1 N, R67W; Section 30, TI N, R66W <br />Platte Valley Pit <br />Section 30, T1 N, R66W <br />Distel Pit <br />Sections 7, 8, 9, 17 and 18, T2N, R68W <br />Tull Pit <br />Sections 9, 16 and 17, T2N, R68W <br />W.W. Farms Pit <br />Sections 32 and 33, T6N, R66W <br />F -Street Pit <br />Sections 34 and 35, T6N, R66W <br />This SWSP previously included the Teti Pit (WDID 0203027) and the North Dahlia Pit (WDID <br />0203028). A plan for augmentation for these two sites was decreed in water court case no. <br />2007CW198 on December 17, 2013 and all depletions from these sites will be replaced under the <br />decreed plan for augmentation. It is noted that the East 8th Street Pit (M-2000-082, WDID 0303016) is <br />no longer a part of this Combined SWSP. Aggregate sold this pit to Superior Oilfields and as of <br />November 2012 this pit is no longer covered by Aggregate. All depletions impacting the river are the <br />responsibility of Superior and are now covered under Superior's SWSP (WDID 0302562). A summary of <br />the pit operations at each of the eleven sites remaining in this SWSP is provided below. <br />Jeronimus Pit Status: Mining operations at the Jeronimus Pit are complete. Operations <br />(South Platte on-site include backfilling of the pit with fines from the Hazeltine Pit. <br />Mainstem) Depletions covered by this SWSP are limited to water lost due to <br />evaporation. The 14.7 -acre area exposed at the Jeronimus Pit prior to <br />1981 is tied to the location as shown on the exhibit dated January 31, <br />2011 as provided in the 2011 SWSP. The credits for the pre -1981 area are <br />tied to the location identified on that map and may not be re -allocated <br />to other areas of ground water exposure within the gravel pit permit <br />boundary. <br />Exposed Ground Water Surface: 5.6 acres post -81, 14.7 acres pre -81 <br />Active Dewatering: No <br />Hazeltine Pit Status: Mining operations at the Hazeltine Pit have been completed and <br />(South Platte reclamation is in progress. The Hazeltine Pit was lined with a soil <br />Mainstem) bentonite slurry wall, and was approved as having been lined to the <br />design standard referenced in the August 1999 State Engineer Guidelines <br />-oF _coo <br />Office of the State Engineer <br />1313 Sherman Street, Room 821, Denver, Co 80203 P 303.866.3581 7a <br />www. water.state.co-us ,{ <br />