Laserfiche WebLink
STAGER <br />Construction, Inc. <br />1850 E. I". Street, Craig, CO 81625 <br />Phone & Fax (970) 824-2709 <br />WagnerCorp@q.com <br />access roads will be maintained and only portable structures will be used within <br />operating distances of mining phases. <br />f) The general post -mined area will be leveled and graded with the existing rock <br />overburden to accommodate anticipated construction and agricultural building <br />activities. <br />a. Overburden Management — excavators, dump trucks, loaders <br />No waste material is anticipated as all primary product will be extracted and <br />removed from the site. <br />g) Sand and gravel are the primary commodities to be mined. <br />h) The topsoil will be salvaged for use in the landscaping, backfilling and structural <br />fill process. Topsoil from the mine excavation will be stockpiled for reclamation <br />activities and stored at the highest point along the perimeter of the excavation. <br />i) No explosives will be used in mining operations. <br />