Laserfiche WebLink
Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Material consistency: <br />1.100 <br />Dozing method: <br />1.100 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />1.000 <br />Push gradient: <br />1.516 <br />Altitude: <br />0.930 <br />Material Weight: <br />0.902 <br />Blade type: <br />1.000 <br />Net correction: 0.9579 <br />Adjusted unit 2,749.46 LCY/hr <br />production: <br />Adjusted fleet 5498.92 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.164/LCY <br />Total job time: 7.80 Hours <br />Total job cost: $7,051 <br />Source <br />(AVG.) <br />(CAT HB) <br />(50% SL) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />CIRCES Cost Estimating Software <br />