Laserfiche WebLink
Task description: <br />Site: Yoast Mine <br />BULLDOZER WORK <br />Grade Valora Pit E/W (Scraper Pit) Highwall <br />Permit Action: RN4 Permit/Job#: C1994082 <br />PROJECT IDENTIFICATION <br />Task #: 02B <br />Date: 3/3/2017 <br />1:41:33 PM <br />State: Colorado <br />County: Routt <br />User: JDM <br />Agency or organization name: <br />DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DI IT - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Abbreviation: None <br />Filename: C082 -02b <br />$226.13 <br />Utilization % <br />NA <br />$183.90 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />$451.88 <br />$903.75 <br />MATERIAL QUANTITIES <br />Initial Volume: 42,900 <br />Swell factor: 1.000 <br />Loose volume: 42,900 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />2,870.3 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-25% <br />7,800 feet <br />2,550 lbs/LCY <br />Sandstone <br />CIRCES Cost Estimating Software <br />