Laserfiche WebLink
Ouray Silver Mines Inc. Table <br /> Technical Revision 09 PAR response <br /> Table 1. Exisitng and Proposed Reclamation Cost <br /> Re-arranged <br /> Mine Equipment 145'x 50'Quonset 6"foundation to be Building No, storage with <br /> 11 None $2,000 $2,000 <br /> Storage/Shop Hut covered/reclaimed Slab Yes additional <br /> roofing <br /> Switch gear <br /> 12 25'x 30' Partial concrete slab Yes Electrical Use Roof Expansion $0 $0 <br /> Building <br /> Miscellaneous <br /> 13 Pipes Structures, None $5,000 $5,000 <br /> Materials <br /> 28'diameter x 8' 1692 sq.ft.foundation <br /> Thickener, plus 4' high walls with <br /> 14 foundation,and high steel structure footers for beam No None None $23,000 $5,000 <br /> piping on steel beams <br /> support <br /> Totals $23,700 n $35,100 <br /> Notes: <br /> a Corrected from 8,000 to 10,000 to reflect the 10,0000 gallon diesel tank that was premitted and installed. <br /> b The previously calcualted total did not include the erroneous Thickener cost. <br />