Laserfiche WebLink
Ouray Silver Mines Inc. Table <br /> Technical Revision 09 PAR response <br /> Table 1. Exisitng and Proposed Reclamation Cost <br /> Reclamation TR09 <br /> # Structure Construction Foundation Permanent Post Mine Use TR09 changes Cost Reclamation <br /> Cost <br /> Yes, remove <br /> Expansion: add <br /> certain Storage <br /> 6"concrete slab w/ 1,410 square <br /> 1 Office/Dry Building 2 Story $2,400 $3,600 <br /> rebar <br /> inside items feet(3,760 <br /> total) <br /> Yes but Expansion:add <br /> 2 story 6" concrete 12" concrete slab w/ remove 6,004 square <br /> 2 Filter Building Storage $4,000 $8,000 <br /> walls rebar inside feet(12,017 <br /> equipment total) <br /> 500 gal Water Plastic 500 gallon <br /> 3 None No None None $600 $600 <br /> Tanks(4) water tanks <br /> Expanded <br /> Yes but roofing over <br /> Snow Shed/Battery 45'x120' metal remove existing bonded <br /> 4 Charger Building siding with track inside 6"concrete slab Storage buildings to $1,400 $1,400 <br /> equipment <br /> connect to <br /> Switch yard <br /> building <br /> Crusher Retaining <br /> 5 Wall 28 long x 16, high Wood and Steel Beams No None None $4,000 $4,000 <br /> Septic Tank/Septic <br /> 6 Yes None None $0 $0 <br /> Field <br /> Access Road <br /> 7 Retaining Wall 100' long gabions None Yes Site Access None $0 $0 <br /> Miscellaneous Various materials <br /> 8 None No None None $3,500 $3,500 <br /> Surface Cleanup on site <br /> 10,000 Gallon <br /> 9 Steel tank on skids None No None None $500 $500 <br /> Diesel Tank a <br /> tanks covered with None No None Covered with <br /> �0 Propane Tanks 3 sheds Sheds $300 $1,500 <br />