Laserfiche WebLink
Truck Cvcle Time: <br />Truck Exchange Time: 0.50 Minutes <br />Truck Load Time: 0.742 Minutes <br />Truck Maneuver and Dump 0.80 Minutes <br />Time: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />0.500 <br />Minutes <br />0.742 <br />Minutes <br />0.800 <br />Minutes <br />Truck Travel (Haul & Return) Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, <br />maintained 3.0 <br />Grade (%) <br />Roll. Res <br />Total Res <br />Haul Route: <br />Travel <br />Production <br />470.54 LCY/Hour Adjusted for job efficiency: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Optimal No. of Trucks: <br />8 Truck(s) Selected Number of Trucks: <br />6 Truck(s) <br />(Ft) <br />Adjusted hourly truck team production: 303.54 <br />(%) <br />(%) <br />(fpm) <br />Time <br />1 <br />10560.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />3.703 <br />min <br />1 <br />10560.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />3.843 <br />Haul Time: <br />3.843 <br />minutes <br />Return Route: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $1.629 <br />Team(s) Total job time: 7.01 Hours <br />/LCY Total job cost: $3,464 <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Production <br />470.54 LCY/Hour Adjusted for job efficiency: <br />(Ft) <br />Truck Unit Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />50.59 LCY/Hour <br />Optimal No. of Trucks: <br />8 Truck(s) Selected Number of Trucks: <br />6 Truck(s) <br />Adjusted hourly truck team production: 303.54 <br />LCY/Hour <br />min <br />LCY/Hour <br />1 <br />10560.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />3.703 <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $1.629 <br />Team(s) Total job time: 7.01 Hours <br />/LCY Total job cost: $3,464 <br />Return Time: 3.703 <br />minutes <br />Total Truck Cycle Time: 9.588 <br />minutes <br />Loading Tool unit <br />Production <br />470.54 LCY/Hour Adjusted for job efficiency: <br />390.55 LCY/Hour <br />Truck Unit Production <br />60.95 LCY/Hour Adjusted for job efficiency: <br />50.59 LCY/Hour <br />Optimal No. of Trucks: <br />8 Truck(s) Selected Number of Trucks: <br />6 Truck(s) <br />Adjusted hourly truck team production: 303.54 <br />LCY/Hour <br />Adjusted single truck/loader team production: 303.54 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 303.54 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $1.629 <br />Team(s) Total job time: 7.01 Hours <br />/LCY Total job cost: $3,464 <br />