My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-03_REVISION - C1992081
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2017-03-03_REVISION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2017 10:41:42 AM
Creation date
3/3/2017 10:34:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
3/3/2017
Doc Name
Midterm Review Document
From
DRMS
To
Jerry Nettleton
Type & Sequence
MT5
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Payload Capacity: 10.10 <br />Truck Bed (volume) Basis: <br />LCY <br />Page 42 of 74 <br />Struck Volume: 8.00 LCY <br />Heaped Volume: 10.00 LCY <br />Average Volume: 9.00 LCY <br />Adjusted Volume: 10.00 LCY <br />Final Truck Volume Based on Number of Loader Passes: 9.74 LCY <br />Loading Tool Capacity <br />Bucket Size Class: Large <br />Rated Capacity: 3.330 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - mixed moist aggregates 95-100% 0.975 <br />Adjusted Capacity: 3.247 LCY <br />Job Condition Corrections: Site Altitude (ft.): 6400 feet <br />Truck <br />Loader <br />Source <br />Altitude Adj: 1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: 0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill 3 <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, NA <br />maneuver): <br />passes <br />minutes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />NA <br />NA <br />(Cat HB) <br />Stockpile: <br />NA <br />NA <br />(Cat HB) <br />Truck Ownership: <br />NA <br />NA <br />(Cat HB) <br />Operation: <br />NA <br />NA <br />(Cat HB) <br />Dump Target: <br />NA <br />NA <br />(Cat HB) <br />Net Cycle Time Adjustment: NA minutes <br />Adjusted Loader Cycle Time: 0.321 minutes <br />Net Load Time per Truck: 0.742 minutes <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.