My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-03_REVISION - C1992081
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2017-03-03_REVISION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2017 10:41:42 AM
Creation date
3/3/2017 10:34:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
3/3/2017
Doc Name
Midterm Review Document
From
DRMS
To
Jerry Nettleton
Type & Sequence
MT5
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad: 1.000 <br />NA <br />CAT HB <br />Job Efficiency: 0.830 <br />NA <br />CAT HB <br />Page 26 of 74 <br />Site Altitude: 6400 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />2000.00 <br />3.00 <br />4.00 <br />7.00 <br />1362 <br />1.54 <br />Haul Time: 1.54 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(f m) <br />Travel Time <br />(min) <br />1 <br />2000.00 <br />-3.00 <br />4.00 <br />1.00 <br />2963 <br />0.79 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 885.50 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $0.932 /LCY <br />0.79 <br />minutes <br />3.93 <br />minutes <br />734.96 <br />LCY/Hour <br />2 <br />Scraper(s) <br />734.96 <br />LCY/Hour <br />734.96 <br />LCY/Hour <br />Total job time: 122.73 Hours <br />Total job cost: $84,068 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.