Laserfiche WebLink
Page 25 of 74 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil on Rail Loop and Facilities Area <br />Site: Hayden Gulch Loadout Permit Action: MT5 Permit/Job#: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: 024 State: Colorado Abbreviation: None <br />Date: 3/3/2017 County: Routt Filename: C81-024 <br />8:41:18 AM <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />COSTShift basis: 1 per day <br />Cost Breakdown: Scraner Work Team Sunnort Fouinment Maintenance F,auinment <br />Total work team cost/hour: $684.98 <br />MATERIAL OUANTITIES <br />Initial volume: 80,180 CCY Swell factor: 1.125 <br />Loose volume: 90,203 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />1[1111.7 ald 9 till 111IOy Y [I],I <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$152.84 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$158.39 <br />NA <br />NA <br />NA <br />NA <br />NA <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$31.26 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$342.49 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$684.98 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $684.98 <br />MATERIAL OUANTITIES <br />Initial volume: 80,180 CCY Swell factor: 1.125 <br />Loose volume: 90,203 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />1[1111.7 ald 9 till 111IOy Y [I],I <br />Material weight: <br />2,550 lbs/LCY <br />Material description: <br />Earth - Dry packed <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />32.00 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />