My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-22_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2017-02-22_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 3:27:47 PM
Creation date
2/22/2017 3:25:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
2/22/2017
Doc Name
Request for Technical Revision
From
Newmont / CC&V
To
DRMS
Type & Sequence
TR88
Email Name
TC1
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWMONT <br />February 16, 2017 <br />RECEIVE® <br />FEB Z 2 2017 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />SENT CERTIFIED RETURN RECEIPT REQUESTED <br />7015-1660-0000-0779-8577 <br />Mr. Timothy Cazier, P.E. <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: <br />Dear Mr. Cazier: <br />Newmont Mining Corporation <br />Cripple Creek & Victor Gold Mining Company <br />100 N 3ftl St <br />P.O. Box 191 <br />Victor, CO 80860 <br />www. newm ont.com <br />J Annual Fee/Report: CW <br />J Violations: <br />MV1995007 <br />MV19%050 <br />7/26/1995 <br />M V 1995070 <br />1 O/23/1995 <br />MV2015005 <br />5/27/2015 <br />MV2016035 <br />6/22/2016 <br />AB 10/25/1995 <br />AB 8/2/1995 <br />AB 10/17/1995 <br />AB 1/18/2017 <br />Per discussion with the Division of Reclamation, Mining and Safety (DRMS) over the phone February 8, <br />2017, Newmont Mining Corporation's (Newmont) Cripple Creek and Victor Gold Mining Company <br />(CC&V) hereby submits the following Technical Revision (TR) #88 proposing the reroute of a powerline <br />in preparation for the Globe Hill Pit operations. The Ironclad Power Reroute Project will include the <br />addition of 30 power poles and associated powerline with a subsequent removal of 10 power poles and <br />associated powerline. <br />Back rg o <br />Mining the upper benches of the Globe Hill Pit in 2017 will involve benches that will cut through an area <br />with an existing powerline that provides electricity to the Ironclad facilities. This powerline is a <br />"regulated" line owned by Black Hills Energy and is fed from the Cripple Creek substation. This 3 phase, <br />13.2 kV powerline terminates at CC&V's Ironclad facilities; therefore the only customer affected by this <br />change is CC&V. <br />Plan <br />The proposed powerline will tie into an existing 3 phase, 13.2kV circuit that originates from the Arequa <br />Gulch substation. This part of the line is an "unregulated" double circuit that is owned by Newmont and <br />feeds the Mill, Crusher, ADR2 and other power needs internal to the mine site. The proposed power line <br />tied into the circuit above the Mill will use 30 power poles and 6,914 feet of powerline to re -feed into the <br />south side of the Ironclad facility (Figure 1). The proposed powerline will stay entirely on site and <br />
The URL can be used to link to this page
Your browser does not support the video tag.