Laserfiche WebLink
f. Name of individual authorizing supplemental water and quantity of supplemental <br />water added. <br />g. Outdoor temperature in shade. <br />h. Time at which water was added. <br />i. Elapsed time between when water was added and concrete load was in place. <br />j. Numerical sequence of delivery by indicating cumulative yardage delivered on <br />each ticket. <br />I. Placement Schedule. <br />1. Submit placement schedule showing placement location, placement quantity, <br />penetration locations, and embedment types and locations no later than three weeks <br />prior to intended placement date. <br />1.4 PRODUCT DELIVERY, STORAGE, AND HANDLING <br />A. Cement. <br />1. Store in weathertight enclosures and protect against dampness, contamination, and <br />warehouse set. <br />2. Do not use cement that has become caked or lumpy. <br />B. Aggregates. <br />1. Stockpile to prevent excessive segregation or contamination with other sizes of <br />aggregates. <br />2. Use only one (1) supply source for each aggregate stockpile. <br />3. The bottom six inches (6") of all aggregate piles in contact with the ground shall not <br />be used. <br />C. Admixtures. <br />1. Store to prevent contamination, evaporation, or damage. <br />2. Protect liquid admixtures from freezing or harmful temperature ranges. <br />3. Agitate emulsions before use. <br />D. Rubber and Plastic Materials. <br />1. Store in cool place away from direct sunlight. <br />E. Mixing and Transporting Ready -mixed Concrete. <br />1. Mixed and transported per ASTM C94 and ACI 304. <br />2. A copy of each delivery ticket, including batch weights and all information specified, <br />shall be handed to the Engineer by the truck operator at the time of delivery. <br />Cast -In -Place Concrete February 2017 03300-4 <br />