My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-21_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2017-02-21_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 8:15:08 AM
Creation date
2/21/2017 4:24:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
2/21/2017
Doc Name
Request for Technical Revision
From
Battle Mountains Resources, Inc.
To
DRMS
Type & Sequence
TR34
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Plus 0.01 to minus 0.2 feet for finish grade beneath structures and dam crest. <br />Grade tolerances apply to surfaces underlying Riprap. Subtract nominal thickness of <br />Riprap from final grades shown on the Drawings to determine grade to which that <br />tolerance applies. <br />Finish lines and grades shall not be consistently high or low within the tolerance ranges. <br />Dimensions of fill on the drawings shall be to the dimensions shown unless otherwise <br />approved by the Engineer. <br />3.8 PROTECTION AND REPAIR <br />A. Protecting Graded Area: Protect graded areas from ponded water. <br />B. Repair and re-establish grades: Materials not meeting the specified moisture content <br />and/or percent compaction shall be reworked until acceptable results are obtained. <br />Reworking may include removal, rehandling, reconditioning, rerolling, or combinations <br />of these procedures. The Contractor shall not be entitled to additional compensation by <br />reason of any Work required to achieve the placement moisture content and percent <br />compaction in these Specifications. Fill in excess of the grades delineated on the <br />Drawings shall be removed. <br />3.9 DISPOSAL OF SURPLUS AND WASTE MATERIALS <br />A. Transport surplus excavated material to Owner -designated Spoil Areas. <br />B. Placement and Compaction: Place and compact spoil materials in accordance with <br />paragraph 3.6.E. of this Specification. Grade outer slopes of spoil areas to slopes no <br />steeper than 4H:1 V, and top surfaces no steeper than 2% to drain. Reclaim slopes and <br />top of spoil piles in accordance with Section 02210. <br />3.10 INSTALLATION OF GEOSYNTHETICS <br />A. Geotextile: Per Section 02205. <br />END OF SECTION 02200 <br />Earthwork February 2017 02200-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.