My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-21_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2017-02-21_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 8:15:08 AM
Creation date
2/21/2017 4:24:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
2/21/2017
Doc Name
Request for Technical Revision
From
Battle Mountains Resources, Inc.
To
DRMS
Type & Sequence
TR34
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.2 SITE CLEARING AND GRUBBING <br />A. Clear and grub all trees, shrubs, stumps, roots, and other protruding obstructions as <br />required to permit installation of new construction, and within approved stockpile or spoil <br />pile locations. Completely remove stumps, roots, and other debris protruding through the <br />ground surface. <br />3.3 DISPOSAL OF MATERIAL <br />A. All vegetative material, including cull logs, tree limbs and branches, snags, and shrubs, <br />exclusive of stumps, shall be piled for burning in accordance with applicable permits. All <br />piles of vegetative material shall be located so that burning operations will not damage <br />standing live trees. <br />B. Remove stumps, roots, rubbish, rock and other objectionable materials derived from the <br />clearing and grubbing, and which do not meet the above descriptions of materials <br />designated for burning to a location identified by Contractor and approved by Owner. <br />3.4 TOPSOIL STRIPPING <br />A. Strip topsoil from areas to be further excavated and within areas to be occupied by <br />permanent construction. <br />B. Strip topsoil to whatever depths it is encountered in a manner that prevents intermingling <br />with underlying objectionable material. <br />3.5 TOPSOIL STOCKPILING <br />A. Stockpile topsoil in areas located by Contractor and approved by Owner. <br />B. Protect topsoil stockpiles from erosion. <br />END OF SECTION 02100 <br />Topsoil Stripping and Stockpiling February 2017 02100-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.