Laserfiche WebLink
F. Climatic Conditions and Product Status <br />1. Install each unit of work under conditions to ensure best possible results in <br />coordination with entire project. <br />2. Isolate each unit of work from incompatible work as necessary to prevent <br />deterioration. <br />3. Coordinate enclosure of work with required inspections and tests to minimize <br />necessity of uncovering work for those purposes. <br />4. Handle materials in a manner to prevent scratching, abrading, distortion, chipping, <br />breaking, or other disfigurement. <br />G. Mounting Heights <br />1. Where not indicated, mount individual units of work at industry -recognized standard <br />mounting heights for particular application indicated. <br />2. Refer questionable mounting height choices to Engineer for final decision. <br />H. Furnish workmen and attendants on a continuous basis as required to complete activities <br />that must be performed without interruption for proper results. <br />I. Temporary Bracing, Shoring, or Other Support <br />1. Provide where necessary. <br />2. Keep in place until final connections are installed. <br />3. Leave in place as long as practical for safety and to maintain proper alignment. <br />J. Leave finished surfaces smooth and flat, free from wrinkles, warps, scratches, dents, and <br />other imperfections. <br />K. Furnish materials in longest practical lengths and largest practical sizes to avoid <br />unnecessary jointing. <br />END OF SECTION 01600 <br />Materials and Equipment February 2017 01600-5 <br />