Laserfiche WebLink
B. Maintain approach walks free of mud, water, and snow. <br />3.4 REMOVAL <br />A. Remove temporary field offices and storage sheds, contents and services at a time they <br />are no longer needed. <br />B. Remove foundations and debris, grade the site to required elevations, clean the areas and <br />restore to original condition or better. <br />C. Removal, grading and cleanup is required for Final Acceptance. <br />END OF SECTION 01590 <br />Field Offices and Sheds February 2017 01590-3 <br />