Laserfiche WebLink
January 19, 2017 C-1980-007/West Elk Mine LDS <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 6 <br /> <br /> TR-140 was found complete by the Division on October 17, 2016. The proposed decision due date has <br />been extended to May 5, 2017. <br />PROCESSING WASTE/COAL MINE WASTE PILES – Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br /> No waste was being generated or transported at the time of the inspection. No attempt was made to access <br />the RPEE. There was no sign of recent activity on the RPE. <br /> <br />ROADS – Rule 4.03 <br />Surfacing and Maintenance 4.03.1(5) and (6)/4.03.2(5) and (6): <br /> Roads around the main facilities area and up to the Sylvester Gulch fan site had been cleared of snow and <br />were in good shape. <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br /> Contractors (Beavers) were on site, working on burying a section of water pipe along the side of the <br />MB5E ponds to prevent it from freezing. <br /> <br /> <br />DOCUMENTS RECEIVED <br />N/A <br /> <br />OTHER (SPECIFY) <br />N/A <br /> <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />