My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-17_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2017-02-17_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 2:04:40 PM
Creation date
2/17/2017 11:02:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
2/17/2017
Doc Name
Reclamation Cost Estimate
From
Janet Binns
To
Leigh Simmons
Type & Sequence
RN7
Email Name
JHB
JRS
LDS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
056 <br />Rip Main Surface Facilities Area <br />RIPPER <br />4 <br />4.67 <br />$4,812.00 <br />057 <br />Backfill/grade shop and warehouse area <br />DOZER <br />4 <br />3.60 <br />$3,709.00 <br />058 <br />Backfill/grade office/bathhouse area <br />DOZER <br />4 <br />7.11 <br />$7,323.00 <br />059 <br />Backfill/grade parking lot <br />DOZER <br />4 <br />10.88 <br />$11,202.00 <br />061 <br />Backfill Ponds MB -1 and FW -1 <br />DOZER <br />4 <br />1.02 <br />$1,048.00 <br />062 <br />Regrade Pond MB -1 <br />DOZER <br />4 <br />33.43 <br />$34,409.00 <br />063 <br />Regrade freshwater pond FW -1 <br />DOZER <br />4 <br />16.59 <br />$17,074.00 <br />067 <br />Regrade Pond MB -3 <br />DOZER <br />4 <br />2.48 <br />$2,548.00 <br />070 <br />Regrade diversion ditches DCW-IA, DCW-1B, and D1- <br />6 <br />EXCAVATE <br />1 <br />13.17 <br />$1,951.00 <br />071 <br />Regrade all sediment ditches <br />EXCAVATE <br />1 <br />1.29 <br />$192.00 <br />072 <br />Rip new light use and access roads <br />RIPPER <br />4 <br />0.43 <br />$448.00 <br />073 <br />Regrade Middle Mine Facilities Road <br />EXCAVATE <br />1 <br />10.77 <br />$1,595.00 <br />075 <br />Spread topsoil on parking lot expansion, approved MR- <br />317 <br />DOZER <br />1 <br />3.28 <br />$844.00 <br />076 <br />Finish grade backfilled areas <br />DOZER <br />4 <br />19.37 <br />$19,936.00 <br />077 <br />Rip expanded mine entrance area <br />RIPPER <br />4 <br />0.14 <br />$148.00 <br />078 <br />Regrade mine entrance expansion area <br />DOZER <br />4 <br />1.15 <br />$1,185.00 <br />079 <br />Replace topsoil f/stockpile to add'1 disturb. at mine <br />entran <br />TRUCKI <br />1 <br />1.68 <br />$1,642.00 <br />080 <br />Rip Bear #1 Mine area and MB -5E <br />RIPPER <br />4 <br />1.79 <br />$1,851.00 <br />081 <br />Haul Bear Mine area riprap stockpile to base of fill <br />TRUCKI <br />1 <br />4.26 <br />$4,156.00 <br />082 <br />Dispose of remaining stockpiled brush on Bear Mine <br />bench <br />TRUCKI <br />1 <br />8.17 <br />$6,226.00 <br />083 <br />Regrade access road from Sylvester Gulch Rd to office <br />EXCAVATE <br />1 <br />19.98 <br />$2,960.00 <br />084 <br />Rip access road from Hwy 133 to Sylvester Gulch Road <br />RIPPER <br />4 <br />0.21 <br />$222.00 <br />085 <br />Regrade haul/access road from Hwy 133 to Syl. Gulch <br />Fan Rd. <br />DOZER <br />4 <br />8.20 <br />$8,444.00 <br />086 <br />Regrade sewage treatment pond <br />DOZER <br />4 <br />0.02 <br />$24.00 <br />087 <br />Regrade P-2 conveyor bench <br />DOZER <br />4 <br />4.30 <br />$4,426.00 <br />088 <br />Regrade Pond MB -5E <br />DOZER <br />4 <br />11.86 <br />$12,211.00 <br />SUBTOTALS: <br />2291.9 <br />$3,061,710 <br />
The URL can be used to link to this page
Your browser does not support the video tag.