Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Costs assoc. with Main facil, LO, & Bear #1 <br />Site: West Elk Mine Permit Action: RN7-subtotal A <br />PROJECT IDENTIFICATION <br />Task #: OOA <br />Date: 2/15/2017 <br />User: JHB <br />State: Colorado <br />County: Gunnison <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1980007 <br />Abbreviation: None <br />Filename: C007-OOA <br />Task <br />Form <br />Description Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />Demo structures in Main Surface Facilities Area DEMOLISH <br />1 <br />1,349.50 <br />$2,301,324.24 <br />002 <br />Rip drill pad for water tank boreholes -Main Facilities RIPPER <br />Area <br />4 <br />0.12 <br />$126.00 <br />003 <br />Rip drill pad for water tank boreholes RIPPER <br />4 <br />0.17 <br />$185.00 <br />004 <br />Re ade 1.2 million gallon water tank pad DOZER <br />4 <br />0.80 <br />$769.00 <br />005 <br />Distribute topsoil atl .2 million gallon water tank pad DOZER <br />4 <br />0.46 <br />$442.00 <br />006 <br />Re ade topsoil 1.2 million gallon water tank pad DOZER <br />4 <br />0.46 <br />$442.00 <br />007 <br />Replace topsoil from on drill pad in meadow above DOZER <br />portals <br />4 <br />0.11 <br />$115.00 <br />008 <br />Replace topsoil from stockpile #5 TRUCKI <br />1 <br />0.31 <br />$261.00 <br />011 <br />Haul fill f/Subsoil PIIe #1 to Train LO Pond MB -4 & TRUCKI <br />Sed Trap <br />1 <br />0.59 <br />$574.00 <br />012 <br />Backfill/re ade Pond MB -4 (Loadout Pond) EXCAVATE <br />1 <br />0.61 <br />$91.00 <br />013 <br />Re ade ramp from Hwy 133 to Loadout EXCAVATE <br />1 <br />2.56 <br />$380.00 <br />018 <br />Rip stockpile at stacker tube and reclaims stem RIPPER <br />4 <br />2.33 <br />$2,406.00 <br />019 <br />Regrade ROM expansion area DOZER <br />4 <br />61.71 <br />$63,516.00 <br />020 <br />Compact backfill at ROM pile expansion COMPACT <br />1 <br />21.97 <br />$4,588.00 <br />021 <br />Re ade ditch DCW-7 DOZER <br />4 <br />0.16 <br />$164.00 <br />022 <br />Re ade Staker Tube Access Road EXCAVATE <br />1 <br />13.67 <br />$2,025.00 <br />023 <br />Replace topsoil from stockpile to ROM pad expansion SCRAPERI <br />1 <br />15.48 <br />$11,617.00 <br />028 <br />Cover refuse pile with subsoil TRUCKI <br />1 <br />64.51 <br />$53,746.00 <br />029 <br />Replace topsoil from water tank stockpile to LRP TRUCKI <br />1 <br />38.77 <br />$37,813.00 <br />030 <br />Backfill/re rade powder magazine DOZER <br />4 <br />0.44 <br />$454.00 <br />031 <br />Backfill/grade substation DOZER <br />2 <br />1.26 <br />$646.00 <br />032 <br />Haul fill from RCC to water tank topsoil pile keyway TRUCKI <br />1 <br />33.26 <br />$39,974.00 <br />033 <br />Re ade water tank topsoil pile keyway material DOZER <br />2 <br />5.05 <br />$2,599.00 <br />034 <br />Compact fill replaced at water tank topsoil pile keyway COMPACT <br />1 <br />8.78 <br />$1,835.00 <br />035 <br />Re lace topsoil on water tank topsoil pile and roads DOZER <br />2 <br />8.02 <br />$4,125.00 <br />036 <br />Re rade light use roads for water tank topsoil pile DOZER <br />4 <br />0.67 <br />$689.00 <br />037 <br />Backfill/grade water storage tank and road DOZER <br />4 <br />0.37 <br />$380.00 <br />038 <br />Backfill portal bench to final contours TRUCKI <br />1 <br />64.11 <br />$62,525.00 <br />039 <br />Backfill and grade storage bench SCRAPERI <br />1 <br />165.86 <br />$124,503.00 <br />040 <br />Push cut material from west fill on to bench DOZER <br />4 <br />39.07 <br />$40,211.00 <br />041 <br />Push west fill to base of cut slope bench DOZER <br />4 <br />44.41 <br />$45,709.00 <br />042 <br />Push fill material back on to cut sloe DOZER <br />4 <br />36.76 <br />$37,831.00 <br />043 <br />Move fill material from portal storage bench to base of DOZER <br />cut <br />4 <br />19.13 <br />$19,691.00 <br />044 <br />Move portal storage bench material on to cut sloe DOZER <br />4 <br />7.42 <br />$7,639.00 <br />045 <br />Compact fill replaced material at MSB excavation site COMPACT <br />1 <br />23.43 <br />$4,893.00 <br />046 <br />Rip storage bench access road RIPPER <br />4 <br />0.16 <br />$174.00 <br />048 <br />Rip portal access road (east of portals) RIPPER <br />4 <br />0.21 <br />$222.00 <br />050 <br />Rip Materials Storage Bench RIPPER <br />4 <br />1.31 <br />$1,351.00 <br />051 <br />Replace topsoil from stockpile to materials storage SCRAPERI <br />bench <br />1 <br />30.87 <br />$23,170.00 <br />052 <br />Replace topsoil from stockpile #5 to MSB cutslo e SCRAPERI <br />1 <br />7.88 <br />$5,912.00 <br />053 <br />Replace topsoil from stockpile #5 to west fill area SCRAPERI <br />1 <br />2.72 <br />$2,040.00 <br />054 <br />Rip Truck Pull-out Lane RIPPER <br />4 <br />0.03 <br />$37.00 <br />055 <br />Re ade mine access road from office to portals EXCAVATE <br />1 <br />26.54 <br />$3,930.00 <br />