Laserfiche WebLink
CIRCES Cost Estimating Software <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />Dozer trap push <br />4x20x10 <br />Demo. and on- <br />800.00 <br />SF <br />$1.18 <br />$947.20 <br />wall <br />site disposal in <br />excavated pit, 6 <br />in. thick - Max. <br />200 ft.push <br />Escape tunnel <br />180 <br />Pipe, reinforced <br />180.00 <br />LF <br />$16.65 <br />$2,997.00 <br />concrete (RCP) - <br />48 in. diameter <br />ie <br />Stacking tube 4 - <br />106xlx12 <br />Bldg. (SN) <br />11,989.00 <br />CF <br />$0.21 <br />$2,457.75 <br />Superstructure <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />-Footings <br />20 <br />Demo. and on- <br />38.00 <br />LF <br />$13.44 <br />$510.80 <br />site disposal in <br />excavated pit, 2.0 <br />ft. x 3 ft. - Max. <br />200 ft.push <br />Overhead <br />555 <br />Conveyor, <br />555.00 <br />LF <br />$53.42 <br />$29,648.10 <br />conveyor <br />elevated, <br />including <br />supports - 8 ft. W <br />x10ft. H <br />housing <br />Reclaim conveyor <br />555 <br />Conveyor, <br />555.00 <br />LF <br />$26.71 <br />$14,824.05 <br />overland, <br />including <br />supports - 8 ft. W <br />x10ft. H <br />housing <br />Topside discharge <br />15x15x33 <br />Bldg. (SN) <br />7,425.00 <br />CF <br />$0.21 <br />$1,522.13 <br />structure <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />Dozer trap push <br />2x3x10 <br />Demo. and on- <br />800.00 <br />SF <br />$2.37 <br />$1,893.60 <br />wall - <br />site disposal in <br />Superstructure <br />excavated pit, 12 <br />in. thick - Max. <br />200 ft.push <br />-Footings <br />2x3 <br />Demo. and on- <br />80.00 <br />LF <br />$13.44 <br />$1,075.36 <br />site disposal in <br />excavated pit, 2.0 <br />ft. x 3 ft. - Max. <br />200 ft.push <br />Escape tunnel <br />180 <br />Pipe, reinforced <br />180.00 <br />LF <br />$16.65 <br />$2,997.00 <br />concrete (RCP) - <br />48 in. diameter <br />ie <br />Silo #1 - <br />145x60 <br />Bldg. (MN) <br />409,995.00 <br />CF <br />$0.23 <br />$94,298.85 <br />Superstructure <br />demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br />-Topside transfer <br />20x20x30 <br />Bldg. (SN) <br />12,000.00 <br />CF <br />$0.21 <br />$2,460.00 <br />building <br />demo./on-site <br />CIRCES Cost Estimating Software <br />