My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-17_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2017-02-17_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 2:04:40 PM
Creation date
2/17/2017 11:02:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
2/17/2017
Doc Name
Reclamation Cost Estimate
From
Janet Binns
To
Leigh Simmons
Type & Sequence
RN7
Email Name
JHB
JRS
LDS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-Walls <br />505xl2x3 <br />Pavement, <br />36.00 <br />CY <br />$124.50 <br />$4,482.00 <br />concrete, <br />demolition only, <br />7 in. to 24 in. <br />thick - <br />Reinforced <br />Run -of -mine <br />1100 <br />Conveyor, <br />1,100.00 <br />LF <br />$53.42 <br />$58,762.00 <br />conveyor <br />elevated, <br />including <br />supports - 8 ft. W <br />x10ft. H <br />housing <br />Transfer conveyor <br />100 <br />Conveyor, <br />100.00 <br />LF <br />$53.42 <br />$5,342.00 <br />elevated, <br />including <br />supports - 8 ft. W <br />x10ft. H <br />housing <br />Silo -to -silo <br />150 <br />Conveyor, <br />150.00 <br />LF <br />$53.42 <br />$8,013.00 <br />conveyor <br />elevated, <br />including <br />supports - 8 ft. W <br />x10ft. H <br />housing <br />Breaker -to -silo <br />800 <br />Conveyor, <br />800.00 <br />LF <br />$53.42 <br />$42,736.00 <br />conveyor <br />elevated, <br />including <br />supports - 8 ft. W <br />x10ft. H <br />housing <br />Silo-to-loadout <br />500 <br />Conveyor, <br />500.00 <br />LF <br />$53.42 <br />$26,710.00 <br />conveyor <br />elevated, <br />including <br />supports - 8 ft. W <br />x10ft. H <br />housing <br />Overhead <br />225 <br />Conveyor, <br />225.00 <br />LF <br />$53.42 <br />$12,019.50 <br />conveyor <br />elevated, <br />including <br />supports - 8 ft. W <br />x10ft. H <br />housing <br />Reclaim conveyor <br />555 <br />Conveyor, <br />555.00 <br />LF <br />$53.42 <br />$29,648.10 <br />elevated, <br />including <br />supports - 8 ft. W <br />x10ft. H <br />housing <br />Overhead <br />225 <br />Conveyor, <br />225.00 <br />LF <br />$53.42 <br />$12,019.50 <br />conveyor <br />elevated, <br />including <br />supports - 8 ft. W <br />x10ft. H <br />housing <br />Reclaim conveyor <br />555 <br />Conveyor, <br />555.00 <br />LF <br />$53.42 <br />$29,648.10 <br />elevated, <br />including <br />supports - 8 ft. W <br />x10ft. H <br />housing <br />Topside discharge <br />15xl5x33 <br />Bldg. (SN) <br />7,425.00 <br />CF <br />$0.21 <br />$1,522.13 <br />structure <br />demo./on-site <br />disposal in <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.