Laserfiche WebLink
February 14, 2017 C-1981-018/Deserado Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 4 of 5 <br /> <br /> <br />The nitrogen injection station near the slot storage was stable with no issues noted. The bleeder shaft/escape hoist <br />was being tested at the time of the inspection. No issues were noted with the facility with the site stable. <br /> <br /> <br />DOCUMENTS RECEIVED - NA <br />OTHER (SPECIFY) - NA <br /> <br />