Laserfiche WebLink
February 14, 2017 C-1981-018/Deserado Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 5 <br /> <br />The D-Seam Dewatering System #2 has not been constructed. However, the two drillholes associated with the <br />system have been completed. <br /> System #2 Drillholes and Pad <br /> <br />PROCESSING WASTE/COAL MINE WASTE PILES – Rule 4.10 and 4.11 Drainage Control; Surface <br />Stabilization; Placement: <br /> <br />Refuse Pile - 2/3/4 refuse was spread and compacted at the time of the inspection with a large stockpile yet to be <br />spread. Grading appeared to allow good run-off to ponds. Refuse Pile - 5 was well compacted and stable at the <br />time of the inspection. Both sites appeared to show good run-off to the ponds via the collection ditches. <br /> <br />ROADS – Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br /> <br />The paved Deserado Mine Road appeared to be well maintained and in good condition. The haul road from the <br />facilities area to the refuse disposal area was dry and stable with no problems noted. The conveyor corridor road, <br />access roads and light-use roads were in good condition with no problems noted. <br /> <br />SUPPORT FACILITIES - Rule 4.04: