My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-16_INSPECTION - C1981018
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981018
>
2017-02-16_INSPECTION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2017 10:49:01 AM
Creation date
2/16/2017 10:37:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Inspection
Doc Date
2/16/2017
Doc Name
Inspection Report
From
DRMS
To
Blue Mountain Energy, Inc
Inspection Date
2/14/2017
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 14, 2017 C-1981-018/Deserado Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 5 <br /> <br />The D-Seam Dewatering System #2 has not been constructed. However, the two drillholes associated with the <br />system have been completed. <br /> System #2 Drillholes and Pad <br /> <br />PROCESSING WASTE/COAL MINE WASTE PILES – Rule 4.10 and 4.11 Drainage Control; Surface <br />Stabilization; Placement: <br /> <br />Refuse Pile - 2/3/4 refuse was spread and compacted at the time of the inspection with a large stockpile yet to be <br />spread. Grading appeared to allow good run-off to ponds. Refuse Pile - 5 was well compacted and stable at the <br />time of the inspection. Both sites appeared to show good run-off to the ponds via the collection ditches. <br /> <br />ROADS – Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br /> <br />The paved Deserado Mine Road appeared to be well maintained and in good condition. The haul road from the <br />facilities area to the refuse disposal area was dry and stable with no problems noted. The conveyor corridor road, <br />access roads and light-use roads were in good condition with no problems noted. <br /> <br />SUPPORT FACILITIES - Rule 4.04:
The URL can be used to link to this page
Your browser does not support the video tag.