My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-31_REPORT - C1981041
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2017-01-31_REPORT - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 7:13:02 AM
Creation date
2/1/2017 6:49:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
1/31/2017
Doc Name
Annual Reclamation Report
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2016
Permit Index Doc Type
Annual Reclamation Report
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. -12- 2016 Annual Reclamation Report <br />Phase II & III Bond Release was approved on 2.9 acres with SL -8 on <br />November 14, 2015. Located in the SE'/, Section 28, T10S, R98W, 6th <br />P.M. <br />Area - 2.9 acres <br />Date - April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />Phase III Bond Release — 2.9 acres <br />26. Conveyor Corridor - The conveyor corridor, from the Xcel culvert north to <br />Haul Road #3 was graded to approximate original contours and re- <br />seeded. Phase I Bond Release was approved on 2.2 acres with SL -2 on <br />October 27, 2003 and on 0.5 acres with SL -5 on November 5, 2009. The <br />0.5 acres achieved final Phase II & III Bond Release with SL -5, approved <br />on November 5, 2009 and the 2.2 acres achieved final Phase II & III Bond <br />Release with SL -7, approved on April 26, 2011. Located in SE%, Section <br />27 and NW%, Section 34, T10S, R98W, 6th P.M. <br />Area - 2.7 acres <br />Date - July 2003 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />Phase III Bond Release - 2.7 acres <br />27. Conveyor Corridor - The conveyor corridor, from the Xcel culvert south <br />to Transfer Building #2 and east of Colorado River where conveyor tube <br />crossed river was graded to approximate original contours and seeded. <br />Phase I Bond Release was approved on 0.6 acres with SL -4 on January <br />11, 2009 and on 1.0 acres with SL -5 on November 5, 2009. A total of 1.3 <br />acres in this area achieved final Phase II & III Bond Release with SL -5 on <br />November 5, 2009. Located in SE%, Section 27 and NW%, Section 34, <br />T10S, R98W, 6th P.M. <br />Area - 1.6 acres <br />Date - March 2004 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />Phase III Bond Release - 1.3 acres <br />28. Substation A - Superstructures, fences, slabs and components removed <br />during 2007. Graded to approximate original contours and seeded. <br />Phase I Bond Release was approved on 0.2 acres with SL -4 on January <br />11, 2009. Located in the SEY4 Section 34, T10S, R98W, 6th P.M. <br />Area - 0.2 acres <br />Date - August 2007 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />29. Roadside South Portal Mine Facilities and Stockpile/Prep Plant Area <br />and Conveyor Tunnel Under 1-70 - The Roadside South Portal Mine <br />Facilities, Stockpile and Prep Plant areas where reclaimed as per <br />approved Permit Revision #3 (PR -3). 13.5 acres were reclaimed during <br />the last two quarters of 2007. These acres include all back filled and <br />graded areas along with buildings and asphalt areas that were approved <br />for retention through PR -3. The east end of the Conveyor Tunnel was <br />