Laserfiche WebLink
Snowcap Coal Company, Inc. <br />-11- 2016 Annual Reclamation Report <br />been incorporated into the "G" Substation area, changing this acreage <br />from 0.5 to 0.6 acres). Phase II Bond Release was approved on 0.6 acres <br />with SL -9 on January 3, 2017. Postmining Land Use was changed to <br />Commercial with PR -6 on January 3, 2017. <br />Area - 0.5 acres <br />Date - September 2008 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components (Needle and <br />Thread was not available, so Indian Rice Grass was increased by 1 <br />Ib/acre, which was approved by Dan Mathews) <br />North Portal Sedimentation Control Features - Pond 13, a portion of the <br />old upper diversion ditch and the flume area at the end of the upper <br />diversion ditch were filled, regraded and seeded. Phase I Bond Release <br />was approved on 2.0 acres with SL -8 on November 14, 2015. <br />Area — 2.0 acres <br />Date — October 2012 <br />Seed Mix — "Seed Mix, Table 14-8", Upland Components <br />Permanent Disturbance — North Portal - Portions of the Upper Diversion <br />Ditch, 1.4 acres, and the remnants of Top Soil Pile #2, 0.3 acres, were <br />approved as permanent features on August 12, 2012 with PR -5. Phase I, <br />II & III Bond Release was approved on 1.7 acres with SL -8 on November <br />14, 2015. <br />Area — 1.7 Acres <br />Phase III Bond Release — 1.7 acres <br />23. Substation B - Superstructures, fences, slabs and components removed <br />during 2002. Graded to approximate original contours and seeded. <br />Phase I Bond Release was approved on 0.3 acres with SL -2 on October <br />27, 2003. Phase II Bond Release was approved on 0.3 acres with SL -8 <br />on November 14, 2015. Located in the SW'/4 Section 35, T10S, R98W, <br />6th P.M. <br />Area - 0.3 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />24. 2 West Portals - Substation of portal area -Reference Exhibit 58. Phase I <br />Bond Release was approved on 0.7 acres with SL -2 on October 27, 2003. <br />Phase II & III Bond Release was approved on 0.7 acres with SL -8 on <br />November 14, 2015. Located in the NE'/4, Section 11, T11S, R98W, 6th <br />P.M. <br />Area - 0.7 acres <br />Date - December 2001 <br />Seed Mix - "Seed Mix, Table 14-6" <br />Phase III Bond Release — 0.7 acres <br />25. Cameo Refuse Disposal Area Topsoil Piles - These piles were used for <br />top soiling the CRDA2 during final reclamation activities. Phase I Bond <br />Release was approved on 2.9 acres with SL -2 on October 27, 2003. <br />