Laserfiche WebLink
copy of the water discharge permit is on file at the New Horizon Mine office and available for <br />review at the Division's request. <br />Table 2.05.4(2)(a)-1 <br />Reclamation Time Table <br />Activity <br />Year <br />Contemporaneous Reclamation of Mined Area <br />2013-2021 <br />Backfill Replacement <br />2013-2021 <br />Topsoil Replacement <br />2013-2022 <br />Relocation of CC Ditch <br />2017 <br />Facilities <br />2022 <br />Haul Roads <br />2022 <br />'The light use road connecting the mining area to Pond NEI -001 will not be reclaimed as it was present in the pre - <br />mine condition. <br />Section 2.05.4 Page 2 April 2016 (PR -01) <br />