My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-30_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2017-01-30_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2017 11:10:57 AM
Creation date
1/30/2017 10:31:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
1/30/2017
Doc Name
Adequacy Review Memo and RCE
From
Jason Musick
To
Brock Bowles
Type & Sequence
RN1
Email Name
JDM
DIH
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />COST SUMMARY WORK <br /> <br />Task description: Summary of Permit Renewal No.1 Tasks <br />Site: New Horizon North Mine Permit Action: RN1 Permit/Job#: C2010089 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 1/27/2017 County: Montrose Filename: C089-000 <br />User: JDM <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Drill and Shoot Highwall BLASTING 1 147.81 $55,290.00 <br />002 Backfill Final Pit with Overburden Stockpile TRUCK1 1 795.18 $1,671,040.00 <br />003 Regrade Trailing Spoil Ridges DOZER 2 1,264.64 $1,215,594.00 <br />004 Regrade Facilities Area DOZER 2 9.75 $9,375.00 <br />005 Regrade Overburden Stockpile Area DOZER 2 5.74 $5,520.00 <br />010 Rip Facilities Area RIPPER 2 5.76 $5,918.00 <br />011 Rip West Haul Road RIPPER 2 5.46 $5,612.00 <br />012 Rip North Haul Road RIPPER 2 0.96 $1,011.00 <br />013 Rip South Access Road RIPPER 2 0.74 $776.00 <br />014 Rip Equipment Corridor Road RIPPER 2 4.02 $4,136.00 <br />015 Rip All Topsoil Replacement Areas Prior to <br />Reseeding <br />RIPPER 2 136.96 $140,574.00 <br />020 Regrade West Haul Road DOZER 2 27.17 $26,118.00 <br />021 Regrade North Haul Road DOZER 2 7.72 $7,417.00 <br />022 Regrade South Access Road DOZER 2 2.96 $2,846.00 <br />023 Regrade Equipment Corridor Road DOZER 2 30.36 $29,180.00 <br />030 Finish Grade Pit Areas GRADER 1 44.71 $6,532.00 <br />031 Finish Grade Facilities Area GRADER 1 5.02 $734.00 <br />032 Finish Grade Overburden Stockpile Area GRADER 1 8.59 $1,255.00 <br />040 Regrade Pond NHN-001 DOZER 1 29.79 $7,519.00 <br />041 Regrade Pond NHN-002 DOZER 1 40.05 $10,108.00 <br />042 Regrade Pond NHN-003 DOZER 1 25.59 $6,458.00 <br />043 Regrade Ditch NHN-001 East DOZER 1 3.75 $948.00 <br />044 Regrade Ditch NHN-001 West DOZER 1 0.65 $164.00 <br />045 Regrade Ditch NHN-002 North DOZER 1 3.42 $862.00 <br />046 Regrade Ditch NHN-002 South DOZER 1 1.16 $292.00 <br />047 Regrade Ditch NHN-003 North DOZER 1 1.78 $450.00 <br />048 Regrade Ditch NHN-003 South DOZER 1 2.91 $733.00 <br />049 Reconstruct 2nd Park Lateral Irrigation Ditch NA 1 105.88 $145,440.00 <br />055 Replace Topsoil from Stockpile to 2013 Pit Area TRUCK1 1 14.97 $26,538.00 <br />056 Replace Topsoil from Stockpile to 2014 Pit Area TRUCK1 1 17.34 $36,443.00 <br />057 Replace Topsoil from Stockpile to 2015 Pit Area TRUCK1 1 17.34 $36,443.00 <br />058 Replace Topsoil from Stockpile to 2016 Pit Area TRUCK1 1 24.86 $52,249.00 <br />059 Replace Topsoil from Stockpile to Facilities Area TRUCK1 1 4.75 $8,423.00 <br />060 Replace Topsoil from Stockpile to Topsoil <br />Stockpile Area <br />DOZER 2 2.05 $1,969.00 <br />061 Replace Topsoil from Stockpile Overburden <br />Stockpile Are <br />TRUCK1 1 8.78 $15,574.00 <br />062 Replace Topsoil from Stockpile to West Haul Road TRUCK1 1 6.34 $13,316.00
The URL can be used to link to this page
Your browser does not support the video tag.