My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-30_REPORT - C1981041
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2017-01-30_REPORT - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2017 10:06:53 AM
Creation date
1/30/2017 9:56:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
1/30/2017
Doc Name
Annual Reclamation Report
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2016
Permit Index Doc Type
Annual Reclamation Report
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. -14- 2016 Annual Reclamation Report <br />32. Cameo Refuse Disposal Area No. 1 (Road) - The "access" road (1.2 <br />acres) to Cameo Refuse Disposal Area No. 1 that had been left open for <br />coal fines clean up was regraded and backfilled to approved final contours <br />and seeded. Phase I Bond Release was approved on 1.2 acres with SL -8 <br />on November 14, 2015. Phase II Bond Release was approved on 1.2 <br />acres with SL -9 on January 3, 2017. Postmining Land Use was changed <br />to Commercial with PR -6 on January 3, 2017. Located in the SE% <br />Section 28, T10S, R98W, 6th P.M. <br />Area - 1.2 Acres <br />Date - September 2010 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />33. Unit Train Load -out and Railroad Loop Track/Conveyor Corridor - <br />Portions of the Unit Train Load -out and Railroad Loop Track/Conveyor <br />Corridor where reclaimed as per approved Permit Revision #4 (PR -4). <br />38.1 acres were backfilled and graded during 2010. 0.9 acres, which <br />includes reclaimed Ponds 1 and 2, footprint of Topsoil Pile #4, and small <br />area where coal fines where removed, was seeded. Phase I, II & III Bond <br />Release was approved on 66.7 acres with SL -7 on April 26, 2011. <br />Located in Sections 26, 27 & 34 T10S, R98W, 6th P.M. <br />Area - 38.1 acres reclaimed, 0.9 acres seeded <br />Date - June & September 2010 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />Phase III Bond Release - 66.7 acres <br />Permanent Disturbance — Haul Road #3 - Haul Road #3, 0.9 acres, was <br />approved as a permanent feature. Phase I, II & III Bond Release was <br />approved on 0.9 acres with SL -7 on April 26, 2011. <br />Area — 0.9 Acres <br />Phase III Bond Release — 0.9 acres <br />34. Cameo Refuse Disposal Area No. 1 & 2 Sediment Ponds (6 & 10) — <br />Sediment Ponds 6 and 10 where filled, graded, top soiled and seeded. <br />Phase I Bond Release was approved on 2.4 acres with SL -8 on November <br />14, 2015. Located in the SE'/4, Section 28, T10S, R98W, 6th P.M. <br />Area — 2.4 acres <br />Date — October 2012 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />Permanent Disturbance — Coal Creek Realignment - The disturbed <br />acres associated with the previously approved realignment of Coal Creek, <br />0.8 acres, were approved as permanent features on August 12, 2012 with <br />PR -5. Phase I, II & III Bond Release was approved on 0.8 acres with SL -8 <br />on November 14, 2015. <br />Area — 0.8 Acres <br />Phase III Bond Release — 0.8 acres <br />35. Permanent Disturbance - Haul Roads to CRDA 1, 2 & 3 - By agreement <br />with the Bureau of Land Management and Xcel Energy, these roads were <br />
The URL can be used to link to this page
Your browser does not support the video tag.