My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-30_REPORT - C1981041
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2017-01-30_REPORT - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2017 10:06:53 AM
Creation date
1/30/2017 9:56:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
1/30/2017
Doc Name
Annual Reclamation Report
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2016
Permit Index Doc Type
Annual Reclamation Report
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. -13- 2016 Annual Reclamation Report <br />backfilled and filled with a 2 foot concrete plug. Due to inclement weather <br />and frozen soils, seeding was postponed until the 1 st quarter of 2008. <br />Phase I Bond Release was approved on 13.5 acres with SL -4 on January <br />11, 2009. These 13.5 acres achieved final Phase II & III Bond Release <br />with SL -6 on December 14, 2010. Located in the SW'/4& SE'/4 Section <br />34, T10S, R98W, 6th P.M. <br />Area - 13.5 acres reclaimed <br />(9.6 acres backfilled and graded) <br />(6.4 acres top soiled) <br />Date - December 2007 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />Phase III Bond Release - 13.5 acres <br />Pond 8 and surrounding area was backfilled, graded to final contours and <br />seeded in 2011. Phase I Bond Release was approved on 0.5 acres with <br />SL -8 on November 14, 2015. Located in the SW'/ & SE%4 Section 34, <br />T10S, R98W, 6th P.M. <br />Area - 0.5 acres <br />Date - October 2011, October 2014 (re -seeded) <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components - 2011 <br />"Salt Tolerant Seed Mix, Table 14-15" — 2014 <br />Pond 9 was backfilled, graded to final contours and seeded in 2013. <br />Phase I Bond Release was approved on 0.4 acres with SL -8 on November <br />14, 2015. Located in the SW'/4 Section 34, T10S, R98W, 6th P.M. <br />Area - 0.4 acres <br />Date - April 2013 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />30. Roadside South Portal Road to Old Upper Diversion Ditch and Water <br />Tank (Light Use Road #1 ) - Portions of Light Use Road #1, as approved <br />by PR -3, was graded to approximate original contours and seeded. <br />Phase I Bond Release was approved on 1.9 acres with SL -4 on January <br />11, 2009. Located in SE'/ Section 34, T10S, R98W, 6th P.M. <br />Area - 1.9 acres <br />Date - September 2007 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />31. Railroad Loop Track (South of 19/10 Road) - The Railroad Loop Track <br />that lies south of 19/10 Road was removed, regraded, backfilled and <br />seeded. This 0.3 acre area was part of the 2.1 acres that achieved final <br />Phase I, II & III Bond Release with SL -5, approved on November 5, 2009. <br />Located in the NW'/4 Section 34, T10S, R98W, 6th P.M. <br />Area - 0.3 acres <br />Date - January 2009 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />Phase III Bond Release - 0.3 acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.