My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-25_REVISION - M1993059
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1993059
>
2017-01-25_REVISION - M1993059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2020 1:56:13 AM
Creation date
1/26/2017 11:33:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993059
IBM Index Class Name
REVISION
Doc Date
1/25/2017
From
Eastern Colorado Aggregates
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18. Revise Exhibit L—Reclamation Cost includes the cost of planting the cover crop as a <br /> separate line item. <br /> 19. Revise Exhibit L—Reclamation Cost to include separate line items for 73 acres—ripping sand <br /> stockpile and processing area and 16.6 acres—ripping topsoil stockpile area. <br /> 20. Revise Exhibit L—Reclamation Cost to include a line item for re-top soiling and re-vegetating <br /> all of the 280.4 acres of disturbed land. <br /> 21. Address Temporary Irrigation Revise Exhibit L—Reclamation Cost includes temporary <br /> irrigation costs for 280.4 acres to be provided by CPW per their agreement with Midwestern <br /> Farms. <br /> 22. Exhibit L includes a line item for "Remove area between two ponds" volume was estimated <br /> as follows: <br /> Cut to breach pond dike =%(Depth of cut)(width of bottom +width at top of bank)(length of <br /> cut) <br /> Cut =%(13 ft.)(196 ft+40 ft)(143 ft) = 219,362 cf/27 cf/cy =8,124.5 bank cy x 1.35% swell <br /> = 10,933 loose cy <br /> 23. Revise Exhibit L—Reclamation Cost—The volume of shore line grading is estimated as <br /> follows: <br /> Length of 3:1 shore line slope = 3,006 ft. <br /> 3:1 Shore line grading= (3,006 ft)(35 ft)(0.5 ft) =52,605 cf/27 cf/cy= 1,948 cy <br /> Length of 6:1 shore line slope = 2,475 ft. <br /> 6:1 shore line grading = (2,475 ft)(35 ft)(0.5 ft) =43,312 cf/27cf/cy = 1,604 cy <br /> 24. Please disregard this statement "Disturbed outer edges 50 acres". Please refer to revised <br /> Exhibit F—Reclamation Plan Map and Revised Exhibit L— Reclamation Cost for clarification <br /> of the existing disturbed areas, top soil borrow area and the eastern shore back slope area. <br /> 25. Refer to Exhibit E— Reclamation Plan revised cross sections E-1, E-2 and Exhibit F <br /> Reclamation Plan Map. The CPW has requested specific sections of pond shoreline to be <br /> left in their current condition. CPW has also requested that sections of shoreline be graded <br /> at 6:1 and 3:1 cross sections at various locations which are indicated on the CPW map. All <br /> other shorelines are requested by CPW to remain at their current slope. <br /> Sincerely <br /> Eastern Colorado Aggregates, RLLLP <br /> X-401/4/ <br /> David A. King <br /> Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.