Laserfiche WebLink
a. Please see that attached letter from CPW which accepts the current Exhibit E- <br /> Reclamation Plan, responsibility for tree and wetland planting and Exhibit F - <br /> Reclamation Plan Map. <br /> 14. Explanation of Adequate Wildlife Reclamation - Please see that attached letter from CPW <br /> which provides an explanation of the wildlife habitat as it relates to the revegetation plan <br /> and the shorelines. <br /> 15. Regarding the 463.2 acre statement. <br /> a. The current disturbed area with the industrial/commercial area = 426.9 acre, which is <br /> less than the 439.2 acres. The additional land is for the NEx topsoil borrow area and the <br /> east side pond back slope area. Please refer to Exhibit F—Reclamation Plan Map and the <br /> following table. <br /> MAP DISTURBED AREA <br /> KEY DESCRIPTION (Acres) <br /> Al Plant Processing/Stockpilearea 221.5 <br /> A2 Sand Beach Area between two ponds 36.5 <br /> A3 SWx/S Strip of disturbed land-South of Ponds 13.9 <br /> A4 JSEx of distrubed land-South of Ponds 8.7 <br /> Subtotal Disturbed Area 280.6 <br /> A5 East Pond Water Surface 23.7 <br /> A6 West Pond Water Surface 72.5 <br /> A7 Pond Dike Breach Water Surface Area 0.9 <br /> Subtotal Water Surface Area 97.1 <br /> A8 INE corner topsoil borrow 25.3 <br /> A9 I East pond additional backslope area 11.0 <br /> Subtotal Additional Distrubed Land 36.3 <br /> A10 Industrial Commercial Area(I/C) 1 49.2 <br /> Total Distrubed Area with and without I/Cl 414.0 1 463.2 <br /> MAP <br /> KEY REQUIRED RECLAMATION SEEDING AREA Acres <br /> Al Plant Processing/Stockpile area 221.5 <br /> A3 SWx/S Strip of disturbed land-South of Ponds 13.9 <br /> A4 SEx of distrubed land-South of Ponds 8.7 <br /> A8 NE corner topsoil borrow 25.3 <br /> A9 I East pond additional backslope area 11.0 <br /> Total Seeding Area 280.4 <br /> 16. Please see the revised and legible Exhibit F—Reclamation Plan Map. <br /> 17. Revise Exhibit L— Reclamation Cost with a statement, "The conveyor belt across the <br /> Burlington Northern Railroad tracks has been removed as of this date." The conveyor <br /> crossing the railroad tracks has been demolished. The conveyor parts and equipment will <br /> be removed from the disturbed area south of the railroad and all associated costs of the <br /> removal have deleted from the reclamation costs. <br />