Laserfiche WebLink
055 <br />060 <br />061 <br />062 <br />063 <br />064 <br />065 <br />066 <br />067 <br />068 <br />069 <br />070 <br />071 <br />072 <br />073 <br />074 <br />075 <br />076 <br />077 <br />080 <br />082 <br />083 <br />084 <br />085 <br />086 <br />087 <br />088 <br />089 <br />090 <br />094 <br />096 <br />097 <br />100 <br />102 <br />104 <br />105 <br />106 <br />107 <br />108 <br />114 <br />Grade Topsoil/Subsoil Storage Area <br />GRADER <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />2 <br />4 <br />1 <br />1 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />3 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />11.53 <br />Regrade Pond RP -1 Area <br />DOZER <br />0.76 <br />Regrade Pond RP -2/3 Area <br />DOZER <br />1.96 <br />Regrade Pond RP -4 Area <br />DOZER <br />2.08 <br />Regrade Pond RP -5a Area <br />DOZER <br />1.41 <br />Regrade TS#2 Sediment Pond <br />DOZER <br />0.05 <br />Remove Scullion Gulch Check Dams <br />TRUCKI <br />3.75 <br />Regrade B -Seam Dewatering System #1 Pond <br />Area <br />DOZER <br />8.23 <br />Regrade B -Seam Dewatering System #2 <br />DOZER <br />4.27 <br />Backfill SDH -3 Dewatering Treatment System <br />DOZER <br />1.97 <br />Replace Topsoil to SDH -3 Dewatering Treatment <br />System <br />DOZER <br />1.50 <br />Replace Topsoil from Stockpile to D -Portal Area <br />SCRAPERI <br />29.30 <br />Replace Topsoil from Stockpile to East and West <br />Haulroads <br />SCRAPERI <br />22.15 <br />Replace Topsoil from Stockpile to RP -2/3/4 <br />SCRAPERI <br />60.51 <br />Replace Topsoil from Stockpile to RP -1 <br />SCRAPERI <br />13.78 <br />Replace Topsoil from Stockpile to RP -5a <br />SCRAPERI <br />69.12 <br />Replace Topsoil from Stockpile to Slot Storage <br />Area <br />SCRAPERI <br />1.57 <br />Replace Topsoil from Stockpile to Alluvial Well <br />Area <br />SCRAPERI <br />0.45 <br />Replace Topsoil from Stockpile to Overland <br />Conveyor Corridor <br />SCRAPERI <br />7.45 <br />Load/Place Topsoil from D -Portal to East Portal <br />Vent Shaft <br />TRUCKI <br />3.98 <br />Replace Topsoil from Stockpile to Access Roads <br />DOZER <br />3.38 <br />Replace Topsoil from Stockpile to Pond RP -5a <br />DOZER <br />2.72 <br />Replace Topsoil from Stockpile to Drill Pads, <br />Ponds, Ditches <br />DOZER <br />22.91 <br />Replace Topsoil from Stockpile to Rock Dust <br />Facility <br />DOZER <br />0.20 <br />Replace Topsoil from Stockpile to Pond, Road, and <br />Laydown <br />DOZER <br />0.53 <br />Replace Topsoil from Stockpile to B -Seam Vent <br />Shaft and Road <br />SCRAPERI <br />0.62 <br />Replace Topsoil from Stockpile to Light Use Road <br />to RDH -3 <br />DOZER <br />0.17 <br />Replace Topsoil from Stockpile to B -Seam <br />Dewatering Area # 1 <br />DOZER <br />0.50 <br />Topsoil Replacement of the Upper Pond B Seam <br />#2 System <br />DOZER <br />13.46 <br />Seal Portals and Vent Shafts <br />MINESEAL <br />160.00 <br />Plug and Seal All Boreholes <br />BOREHOLE <br />512.00 <br />Demolish and Remove All Structures <br />DEMOLISH <br />960.00 <br />Drill Seeding - Large Permanent Areas <br />REVEGE <br />342.08 <br />Broadcast Seeding - Large Permanent Areas <br />REVEGE <br />34.00 <br />Drill Seeding - Small/Linear Areas <br />REVEGE <br />122.18 <br />Broadcast Seeding - Small/Linear Areas <br />REVEGE <br />41.04 <br />Drill Seeding - Interim and Drill Sites <br />REVEGE <br />129.12 <br />Broadcast Seeding - Interim and Drill Sites <br />REVEGE <br />101.40 <br />Weed Control for Reseeded Areas (Assume 20% <br />of Area X 3) <br />REVEGE <br />425.00 <br />Clean Sediment Ponds RP -1, 2/3, 4 and 5a one <br />time <br />TRUCKI <br />61.16 <br />$1,685.00 <br />$764.00 <br />$1,967.00 <br />$2,084.00 <br />$1,410.00 <br />$45.00 <br />$1,866.00 <br />$4,128.00 <br />$4,280.00 <br />$508.00 <br />$385.00 <br />$65,982.00 <br />$49,878.00 <br />$136,268.00 <br />$31,040.00 <br />$155,656.00 <br />$3,534.00 <br />$1,013.00 <br />$16,772.00 <br />$3,326.00 <br />$3,388.00 <br />$2,725.00 <br />$22,975.00 <br />$196.00 <br />$530.00 <br />$1,388.00 <br />$167.00 <br />$501.00 <br />$3,388.00 <br />$58,685.07 <br />$133,073.27 <br />$1,925,027.65 <br />$70,577.00 <br />$29,889.00 <br />$22,160.00 <br />$34,033.00 <br />$22,803.00 <br />$83,120.00 <br />$13,594.00 <br />$25,201.00 <br />CIRCES Cost Estimating Software <br />